3
|
Components
Service manual
132
RXM20~71R + ARXM25~71R + FTXM20~71R + ATXM25~50R +
FVXM25~50A
Split New Perfera R32
ESIE20-11 – 2021.01
e
e
e
e
e
f
a
a
b
c
d
a
Power supply wires from X1M
b
Wire from X1M
c
Ground wiring
d
Connector X11A
e
Screw
f
Main PCB
3
Install and tighten the screws.
4
Route the ground wire through the ferrite core. Install the ground wiring on
the switch box and fix using the screw.
5
Connect the connector X11A.
6
Route the power supply wiring through the ferrite core(s) and connect it to
the main power supply terminal X1M.
7
Route the wire through the ferrite core(s) and connect it to the main power
supply terminal X1M.
8
Connect all other connectors to the main PCB.
INFORMATION
Use the wiring diagram and connection diagram for correct installation of the
connectors, see
223].
Is the problem solved?
Action
Yes
No further actions required.
No
continue with the next procedure.
3.12.2 Class 42~71 units
Checking procedures
INFORMATION
It is recommended to perform the checks in the listed order.
To perform a power check of the main PCB
Prerequisite:
Stop the unit operation via the user interface.
Prerequisite:
Turn OFF the respective circuit breaker.
Prerequisite:
Remove the required plate work, see
151].
Содержание Perfera RXM R Series
Страница 1: ...Service manual Split New Perfera R32 RXM20 71R ARXM25 71R FTXM20 71R ATXM25 50R FVXM25 50A...
Страница 254: ......
Страница 255: ......
Страница 256: ...ESIE20 11 2021 01 Copyright 2021 Daikin Verantwortung f r Energie und Umwelt...