9
|
Electrical installation
Installer reference guide
119
ERGA04~08EA + 08S18+23EA
Daikin Altherma 3 R F
4P629093-1A – 2021.11
f
Smart Grid pulse meter
1
Install the components of the Smart Grid relay kit as follows:
a
b
c
d
e
K1A
K2A
X10M
×2
×4
K1A, K2A
Relays
X10M
Terminal block
a
Screws for X10M
b
Screws for K1A and K2A
c
Sticker to put on the high voltage wires
d
Wires between the relays and X5M (AWG22 ORG)
e
Wires between the relays and X10M (AWG18 RED)
B
A
B
X5M
5 6 9 10
1 2 3 4
K1A
K2A
b
b
X10M
a
2
Connect the low voltage wiring as follows:
A
X5M.4
X5M.3
S4S
B
A
B
X5M
3 4
1314
3
Connect the high voltage wiring as follows:
Содержание EHVZ04S18EA6V
Страница 269: ......
Страница 270: ......
Страница 271: ......
Страница 272: ...4P629093 1A 2021 11 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...