Si18-525B
Instruction
Operation Manual
217
Outdoor Unit
■
Indoor Unit
1. Louvers (vertical blades):
The louvers are inside of the air outlet.
2. Air outlet
3. Flap (horizontal blade)
4. Grille tab
5. Air inlet
6. Display
7. Air filter
8. Photocatalytic deodorizing filter or
Air purifying filter:
• These filters are attached to the inside of the air
filters.
9. Front grille
10. Operation lamp (green)
11. TIMER lamp (yellow)
12. HOME LEAVE lamp (red):
Lights up when you use HOME LEAVE
Operation.
13. Indoor unit ON/OFF switch:
• Push this switch once to start operation.
Push once again to stop it.
• The operation mode refers to the following
table.
• Push the switch using an object with a sharp
tip, such as a pen.
• This switch is useful when the remote controller
is missing.
14. Signal receiver:
• It receives signals from the remote controller.
• When the unit receives a signal, you will hear a
short beep.
• Operation start .............beep-beep
• Settings changed ..........beep
• Operation stop ..............beeeeep
■
Outdoor Unit
15. Air inlet: (Back and side)
16. Air outlet
17. Refrigerant piping and inter-unit cable
18. Drain hose
19. Earth terminal:
• It is inside of this cover.
Appearance of the outdoor unit may differ from some models.
17
18
19
16
15
Mode
Temperature
setting
Air flow rate
AUTO
25
°
C
AUTO
Содержание D-Series
Страница 1: ...Si18 525B Applied Models Super Multi Plus Cooling only Super Multi Plus Heat Pump D Series ...
Страница 33: ...List of Functions Si18 525B 20 List of Functions ...
Страница 34: ...Si18 525B Specifications 21 Part 2 Specifications 1 Specifications 22 1 1 Cooling Only 22 1 2 Heat Pump 42 ...
Страница 71: ...Specifications Si18 525B 58 Specifications ...
Страница 107: ...Printed Circuit Board Connector Wiring Diagram Si18 525B 94 Printed Circuit Board Connector Wiring Diagram ...
Страница 117: ...Refrigerant Flow for Each Operation Mode Si18 525B 104 Refrigerant Circuit ...
Страница 171: ...Indoor Unit SkyAir Models Si18 525B 158 Function ...
Страница 207: ...Test Operation and Field Setting for RA Indoor Unit Si18 525B 194 Test Operation ...
Страница 336: ...Si18 525B Service Check Function Troubleshooting 323 ...
Страница 443: ...BP Unit Si18 525B 430 Removal Procedure The clamps are to be kept in stock Step Procedure Points Clamps Q0529 ...
Страница 469: ...Wiring Diagrams Si18 525B 456 Appendix ...
Страница 475: ...Si18 525B vi Index ...