Si18-525B
Special Control
Function
115
3.2
Oil Return Operation
Oil flown from the compressor to the side of system is collected by oil-returning operation, in
case of that oil in the compressor runs down.
3.2.1 Oil Return Operation in Cooling Operation
[Conditions to start]
The cooling oil-returning operation is started referring following conditions.
Integrated amount of displaced oil
Timer
(After the power is turned on, integrated operating-time is 2 hours and subsequently every 8
hours.)
In addition, integrated amount of displaced oil is derived from Tc, Te, and the compressor
load.
Outdoor unit actuator
Oil return preparation
operation
Oil return operation
Post-oil-return operation
Compressor
Upper limit control
124 Hz
124 Hz
Outdoor unit fan
Fan control
Fan control
Fan control
Four way valve
OFF
OFF
OFF
Main electronic expansion valve
(EV1)
2000 pls
2000 pls
2000 pls
Subcooling electronic expansion
valve (EV2)
SH control
0 pls
0 pls
Hot gas bypass valve (SVP)
OFF
ON
ON
Receiver gas discharging valve
(SVG)
OFF
OFF
OFF
Ending conditions
20 sec.
•
6 min.
•
Ts - Te<5
3 min.
or
Indoor actuator
Cooling oil return operation
Indoor unit fan
Thermostat ON unit
Set Air Volume
Stopping unit
OFF
Thermostat OFF unit
Set Air Volume
BP unit electronic expansion
valve
Thermostat ON unit
SH control
Stopping unit
56 pls
Thermostat OFF unit
SH control
Содержание D-Series
Страница 1: ...Si18 525B Applied Models Super Multi Plus Cooling only Super Multi Plus Heat Pump D Series ...
Страница 33: ...List of Functions Si18 525B 20 List of Functions ...
Страница 34: ...Si18 525B Specifications 21 Part 2 Specifications 1 Specifications 22 1 1 Cooling Only 22 1 2 Heat Pump 42 ...
Страница 71: ...Specifications Si18 525B 58 Specifications ...
Страница 107: ...Printed Circuit Board Connector Wiring Diagram Si18 525B 94 Printed Circuit Board Connector Wiring Diagram ...
Страница 117: ...Refrigerant Flow for Each Operation Mode Si18 525B 104 Refrigerant Circuit ...
Страница 171: ...Indoor Unit SkyAir Models Si18 525B 158 Function ...
Страница 207: ...Test Operation and Field Setting for RA Indoor Unit Si18 525B 194 Test Operation ...
Страница 336: ...Si18 525B Service Check Function Troubleshooting 323 ...
Страница 443: ...BP Unit Si18 525B 430 Removal Procedure The clamps are to be kept in stock Step Procedure Points Clamps Q0529 ...
Страница 469: ...Wiring Diagrams Si18 525B 456 Appendix ...
Страница 475: ...Si18 525B vi Index ...