background image

14

Installation Instructions

Final Installation

Install the cooktop according to its installation instructions. 

Set the cooktop into the countertop opening so that the 

back edge of the cooktop overlaps the leading edge of the 

vent.

Verifying Proper Operation

 wARNING

Read the raised vent use and care manual complete-

• 

ly before operation.
Make sure the filters are installed prior to operating 

• 

the raised vent. Refer to the use and care manual for 

filter installation instructions.

Turn on power to the raised vent at the circuit breaker 

1. 

panel or fuse box.
Press the

2. 

 UP/DOwN

 button once to 

raise the vent to its operating position. 

Once in the up position, the blower 

should come on and the vent should 

begin to draw in air.
Push the 

3. 

OFF, LOw, MEDIUM

 and

 

HIGH

 buttons in turn to make sure the speed changes 

or the blower turns off. 

Press the 

4. 

UP/DOwN

 button once to lower the vent.

Make sure that the top cap on the raised vent intake 

5. 

does not catch on the back edge of the cooktop when 

the intake is lowered. If interference occurs, adjust the 

position of the cooktop to prevent damage.

If the raised vent is not operational after installation:

Make sure that power is being supplied to the raised 

• 

vent and to the blower (via the raised vent).
If the vent will not raise properly or makes a scrap-

• 

ing sound, remove the vent cover or cabinet blower 

and check for obstructions interfering with the raising 

mechanism. Replace the vent cover or cabinet blower 

and make sure it is properly centered over the opening 

on the front of the raised vent.

If the raised vent still does not function after performing the 

above checks, do not attempt to repair it yourself. Contact 

Dacor Distinctive Service at (877) 337-3226. Have the 

model and serial numbers from the product data labels for 

the raised vent and the blower available when you call.
Dacor is not responsible for the cost of correcting problems 

caused by a faulty installation.

Installation Checklist

 wARNING

In the interest of safety, perform the following checklist to 

make sure the unit has been properly installed. Proper 

installation is the responsibility of the consumer.

Are the anchor legs extended down to make contact 

 

with the floor and tightened into place? Are the anchor 

legs fastened to the floor? Is the unit level? 

Is the duct work completely installed? Are all joints 

 

attached with sheet metal screws and wrapped with 

duct tape?

Is the Input Power for the raised vent connected to the 

 

junction box? Are all terminals tight?

Is the blower power input connected to the Output 

 

Power terminals on the raised vent? Are all terminals 

tight?

Is the wiring routed away from the hot surfaces of the 

 

cooktop.

Are the vent filters installed according to the use and 

 

care manual?

Has proper operation been verified?

 

Has the warranty been activated on-line or the warranty 

 

card been filled out completely and mailed?

UP/DOwN

OFF

LOw

MED

HIGH

Содержание RV30

Страница 1: ...ludes installation instructions for optional cabinet blower Dacor model CABP3 Part No 85515 Rev H Use these downdraft raised vents only with approved Dacor cooktops See the installation instructions f...

Страница 2: ...ller In the interest of safety and to minimize problems read these installation instructions completely and care fully before you begin the installation process Leave these installation instructions w...

Страница 3: ...ican Society for Heating Refrigeration and Air Conditioning Engineers ASHRAE and the local code authorities When cutting or drilling into wall or ceiling do not c damage electrical wiring and other hi...

Страница 4: ...e connect only one of the specified blowers Warning General Safety Precautions To reduce the risk of fire electric shock serious injury or death when using your appliance follow basic safety precau ti...

Страница 5: ...16 14 mm 3 1 8 79 mm 2 51 mm B A Adjustable anchor legs 1 13 16 46 mm 1 15 16 49 mm 3 16 5 mm Top cap with vent down 7 178 mm 7 1 2 191 mm Front View 15 16 24 mm 28 711 mm to 34 864 mm Tolerances 1 16...

Страница 6: ...atest revision and local codes and ordinances A copy of this standard may be obtained from National Fire Protection Association 1 Batterymarch Park Quincy Massachusetts 02269 9101 Electrical Supply Re...

Страница 7: ...s cooktops a 90 degree elbow must be connected to the cooktop gas inlet see dia gram at right to avoid interference with the raised vent s front panel Installation Specifications Example of Gas Line R...

Страница 8: ...all Exhaust ILHSF series in line blower 3 1 4 X 10 to round transition Duct work Duct work Outside wall Cooktop Wall cap on outside wall Raised vent Raised vent configured for bottom exhaust Floor Wir...

Страница 9: ...0 CFM ILHSF8 600 CFM ILHSF10 1100 CFM REMP3 600 CFM REMP16 1000 CFM Nominal rating at zero inches static pressure see the CABP3 Cabinet Blower Data on page 15 for actual rating Nominal rating at zero...

Страница 10: ...Bottom exhaust configutation with rear or bottom duct routing DUCT DUCT C L CABP3 Cooktop 25 5 8 651 mm Duct connection center line A Raised vent center line Countertop 3 1 4 X 10 Duct connection Duc...

Страница 11: ...l area than the required duct sizes in the table to the right For best performance keep the duct run as short as possible and never exceed the maximums stated at the right The maximum straight duct le...

Страница 12: ...flange 2 keps nuts 1 4 20 PN 83049 2 flat washers 1 4 20 PN 83203 Insulation foam Installation Preparation warning If the electrical service does not meet the Electrical Specifications on page 4 do n...

Страница 13: ...m tape supplied with the raised vent 1 Place the blower on the floor in the orientation it will be mounted on the front of the raised vent Peel the back ing off the tape and attach it to the right and...

Страница 14: ...t surfaces Make sure power to the junction box that will sup 1 ply power to the raised vent is turned off at the circuit breaker or fuse box Remove the screws from the front of the raised vent 2 elect...

Страница 15: ...CABP3 electrical panel Wire nut 3 places To blower Electrical Wiring Remote or In line Blower Installations ILHSF or REMP series REMP series blower shown Floor Raised vent electrical connections see...

Страница 16: ...lower and check for obstructions interfering with the raising mechanism Replace the vent cover or cabinet blower and make sure it is properly centered over the opening on the front of the raised vent...

Страница 17: ...iring Diagram Airflow CFM Cubic feet minute Static pressure inches of water 0 1 0 2 0 3 0 4 0 5 0 100 200 300 400 500 600 CABP3 Blower Performance POWER CONTROL CIRCUIT BOARD TO PUSH BUTTON CIRCUIT BO...

Страница 18: ...16 Notes...

Страница 19: ......

Страница 20: ...Dacor 600 Anton Blvd Suite 1000 Costa Mesa CA 92626 Phone 800 793 0093 Fax 626 403 3130 www Dacor com...

Отзывы: