background image

11

Installing the Vent in the Cutout

NOTE:

 The raised vent installs in the back of the cutout, 

separate from the cooktop. It is installed prior to final instal-

lation of the cooktop.

Installing the Raised Vent

Cut a hole in the cabinet to allow the duct work to pass 

1. 

through to the floor or wall for the planned duct system 

layout. Use the dimensions on pages 3 and 8 to deter-

mine the hole center line locations.

Gently slide the vent into the rear of the countertop cut-

2. 

out with the electrical access panel toward the front.
Adjust the anchoring leg height so that the end caps 

3. 

are gently resting on the counter, then tighten the hex 

nuts. 
Secure the anchoring legs to the cabinet floor with the 

4. 

supplied wood screws.

Installation Instructions

Front of raised 

vent

(shown configured 

for use with ILHSF 

or REMP series 

blower)

Floor

Top of vent resting 

on countertop

Electrical access 

panel

Anchor leg

ILHSF or REMP Series Blower Installation

If using a ILHSF or REMP series blower, install it according 

to the blower installation instructions.

Cabinet Blower Installation

If using cabinet blower (model CABP3):

Locate the foam tape supplied with the raised vent. 

1. 

Place the blower on the floor in the orientation it will be 

mounted on the front of the raised vent. Peel the back-

ing off the tape and attach it to the right and left flanges 

of the blower base plate.
Remove and retain the three (3) wing nuts from the top 

2. 

retainer bracket on the front of the unit. Remove the 

bracket.
Slide the bottom flange of the blower base plate into 

3. 

the bottom of the retaining bracket with the blower 

exhaust in the desired orientation.
Cover the opening on the front of the unit by pushing 

4. 

the blower against it. Make sure that the foam tape on 

both sides of the base plate creates a good seal on the 

right and left side of the opening. Center the blower 

base plate horizontally over the opening on the front of 

the raised vent. 

IMPORTANT:

 To prevent interference 

with the internal moving parts, make sure the blower 

assembly is properly centered over the opening.
Reinstall the top vent retainer bracket over the blower 

5. 

base plate flange. Secure it in place with the three (3) 

wing nuts removed in step 2.

Rear corner of cutout 

(back of raised vent) 

plumbed down 

Possible Duct Hole Locations

Top retainer 

bracket

Bottom retainer 

bracket

CABP3

Flange

Attach foam 

to right/left 

flanges

Insert bottom 

flange into 

bottom 

retainer 

bracket

Cabinet Blower Installation

Содержание RV30

Страница 1: ...ludes installation instructions for optional cabinet blower Dacor model CABP3 Part No 85515 Rev H Use these downdraft raised vents only with approved Dacor cooktops See the installation instructions f...

Страница 2: ...ller In the interest of safety and to minimize problems read these installation instructions completely and care fully before you begin the installation process Leave these installation instructions w...

Страница 3: ...ican Society for Heating Refrigeration and Air Conditioning Engineers ASHRAE and the local code authorities When cutting or drilling into wall or ceiling do not c damage electrical wiring and other hi...

Страница 4: ...e connect only one of the specified blowers Warning General Safety Precautions To reduce the risk of fire electric shock serious injury or death when using your appliance follow basic safety precau ti...

Страница 5: ...16 14 mm 3 1 8 79 mm 2 51 mm B A Adjustable anchor legs 1 13 16 46 mm 1 15 16 49 mm 3 16 5 mm Top cap with vent down 7 178 mm 7 1 2 191 mm Front View 15 16 24 mm 28 711 mm to 34 864 mm Tolerances 1 16...

Страница 6: ...atest revision and local codes and ordinances A copy of this standard may be obtained from National Fire Protection Association 1 Batterymarch Park Quincy Massachusetts 02269 9101 Electrical Supply Re...

Страница 7: ...s cooktops a 90 degree elbow must be connected to the cooktop gas inlet see dia gram at right to avoid interference with the raised vent s front panel Installation Specifications Example of Gas Line R...

Страница 8: ...all Exhaust ILHSF series in line blower 3 1 4 X 10 to round transition Duct work Duct work Outside wall Cooktop Wall cap on outside wall Raised vent Raised vent configured for bottom exhaust Floor Wir...

Страница 9: ...0 CFM ILHSF8 600 CFM ILHSF10 1100 CFM REMP3 600 CFM REMP16 1000 CFM Nominal rating at zero inches static pressure see the CABP3 Cabinet Blower Data on page 15 for actual rating Nominal rating at zero...

Страница 10: ...Bottom exhaust configutation with rear or bottom duct routing DUCT DUCT C L CABP3 Cooktop 25 5 8 651 mm Duct connection center line A Raised vent center line Countertop 3 1 4 X 10 Duct connection Duc...

Страница 11: ...l area than the required duct sizes in the table to the right For best performance keep the duct run as short as possible and never exceed the maximums stated at the right The maximum straight duct le...

Страница 12: ...flange 2 keps nuts 1 4 20 PN 83049 2 flat washers 1 4 20 PN 83203 Insulation foam Installation Preparation warning If the electrical service does not meet the Electrical Specifications on page 4 do n...

Страница 13: ...m tape supplied with the raised vent 1 Place the blower on the floor in the orientation it will be mounted on the front of the raised vent Peel the back ing off the tape and attach it to the right and...

Страница 14: ...t surfaces Make sure power to the junction box that will sup 1 ply power to the raised vent is turned off at the circuit breaker or fuse box Remove the screws from the front of the raised vent 2 elect...

Страница 15: ...CABP3 electrical panel Wire nut 3 places To blower Electrical Wiring Remote or In line Blower Installations ILHSF or REMP series REMP series blower shown Floor Raised vent electrical connections see...

Страница 16: ...lower and check for obstructions interfering with the raising mechanism Replace the vent cover or cabinet blower and make sure it is properly centered over the opening on the front of the raised vent...

Страница 17: ...iring Diagram Airflow CFM Cubic feet minute Static pressure inches of water 0 1 0 2 0 3 0 4 0 5 0 100 200 300 400 500 600 CABP3 Blower Performance POWER CONTROL CIRCUIT BOARD TO PUSH BUTTON CIRCUIT BO...

Страница 18: ...16 Notes...

Страница 19: ......

Страница 20: ...Dacor 600 Anton Blvd Suite 1000 Costa Mesa CA 92626 Phone 800 793 0093 Fax 626 403 3130 www Dacor com...

Отзывы: