background image

12

Installation Instructions

Duct Work Installation

Install the duct work from the raised vent to the point 

• 

where it exits the building according to the 

Installation 

Specifications

. Use sheet metal screws and duct tape 

to connect and seal all of the pieces. Support the duct 

weight as necessary to ensure sealed joints.
On installations using a ILHSF or REMP series blower, 

• 

run the three conductor wiring required to power the 

blower parallel to the duct work from the raised vent to 

the blower. The wiring must meet the electrical speci-

fications on page 4 and local codes and ordinances. 

Connect it as specified below.

Electrical Installation

 wARNING

ELECTRIC SHOCK HAZARD

• 

 - Turn off power at the 

circuit breaker panel or fuse box prior to connecting 

the unit to the electrical circuit.
Do not ground the appliance with the neutral (white) 

• 

house supply wire. A separate ground wire must be 

utilized.
Failure to complete electrical connections properly 

• 

may result in an electric shock hazard or a damaged 

or non-functional system. Follow the wiring diagrams 

carefully to ensure a proper installation. Do not 

change the factory wired terminal connections inside 

the electrical access panel for the raised vent or the 

blower.
To avoid an electric shock hazard and to prevent 

• 

damage route all wiring away from hot surfaces.

Make sure power to the junction box that will sup-

1. 

ply power to the raised vent is turned off at the circuit 

breaker or fuse box.
Remove the screws from the front of the raised vent 

2. 

electrical access cover and remove it.
Connect the raised vent to the junction box accord-

3. 

ing to 

Wiring Diagram B

 on the facing page and local 

codes and ordinances. Make sure all terminal connec-

tions, including the factory wired connections, are tight.

On installations using an cabinet blower (CABP3):

4. 

Remove the electrical access cover from the front 

• 

of the blower.
Cut a piece of wire/conduit long enough to reach 

• 

from the power terminals inside the raised vent 

to the power terminals inside the CABP3 blower, 

via the electrical access holes on both units. The 

location of the access hole on the CABP3 varies 

depending on the blower orientation.

Connect the wiring/conduit that supplies power to the 

5. 

remote/in-line blower or cabinet blower (as applicable) 

as shown in 

Wiring Diagram B 

on the facing page.

Replace the electrical access panel on the raised vent.

6. 

Connect the blower power supply wiring from the raised 

7. 

vent to the blower:

On installations using a ILHSF or REMP series 

• 

blower, connect the wiring according to the blower 

installation instructions.
On installations using an cabinet blower, (CABP3) 

• 

connect the wiring according to 

Wiring Diagram A

 

on the facing page. Replace the blower electrical 

access cover. Make sure all terminal connections, 

including the factory wired connections, are tight.

Содержание RV30

Страница 1: ...ludes installation instructions for optional cabinet blower Dacor model CABP3 Part No 85515 Rev H Use these downdraft raised vents only with approved Dacor cooktops See the installation instructions f...

Страница 2: ...ller In the interest of safety and to minimize problems read these installation instructions completely and care fully before you begin the installation process Leave these installation instructions w...

Страница 3: ...ican Society for Heating Refrigeration and Air Conditioning Engineers ASHRAE and the local code authorities When cutting or drilling into wall or ceiling do not c damage electrical wiring and other hi...

Страница 4: ...e connect only one of the specified blowers Warning General Safety Precautions To reduce the risk of fire electric shock serious injury or death when using your appliance follow basic safety precau ti...

Страница 5: ...16 14 mm 3 1 8 79 mm 2 51 mm B A Adjustable anchor legs 1 13 16 46 mm 1 15 16 49 mm 3 16 5 mm Top cap with vent down 7 178 mm 7 1 2 191 mm Front View 15 16 24 mm 28 711 mm to 34 864 mm Tolerances 1 16...

Страница 6: ...atest revision and local codes and ordinances A copy of this standard may be obtained from National Fire Protection Association 1 Batterymarch Park Quincy Massachusetts 02269 9101 Electrical Supply Re...

Страница 7: ...s cooktops a 90 degree elbow must be connected to the cooktop gas inlet see dia gram at right to avoid interference with the raised vent s front panel Installation Specifications Example of Gas Line R...

Страница 8: ...all Exhaust ILHSF series in line blower 3 1 4 X 10 to round transition Duct work Duct work Outside wall Cooktop Wall cap on outside wall Raised vent Raised vent configured for bottom exhaust Floor Wir...

Страница 9: ...0 CFM ILHSF8 600 CFM ILHSF10 1100 CFM REMP3 600 CFM REMP16 1000 CFM Nominal rating at zero inches static pressure see the CABP3 Cabinet Blower Data on page 15 for actual rating Nominal rating at zero...

Страница 10: ...Bottom exhaust configutation with rear or bottom duct routing DUCT DUCT C L CABP3 Cooktop 25 5 8 651 mm Duct connection center line A Raised vent center line Countertop 3 1 4 X 10 Duct connection Duc...

Страница 11: ...l area than the required duct sizes in the table to the right For best performance keep the duct run as short as possible and never exceed the maximums stated at the right The maximum straight duct le...

Страница 12: ...flange 2 keps nuts 1 4 20 PN 83049 2 flat washers 1 4 20 PN 83203 Insulation foam Installation Preparation warning If the electrical service does not meet the Electrical Specifications on page 4 do n...

Страница 13: ...m tape supplied with the raised vent 1 Place the blower on the floor in the orientation it will be mounted on the front of the raised vent Peel the back ing off the tape and attach it to the right and...

Страница 14: ...t surfaces Make sure power to the junction box that will sup 1 ply power to the raised vent is turned off at the circuit breaker or fuse box Remove the screws from the front of the raised vent 2 elect...

Страница 15: ...CABP3 electrical panel Wire nut 3 places To blower Electrical Wiring Remote or In line Blower Installations ILHSF or REMP series REMP series blower shown Floor Raised vent electrical connections see...

Страница 16: ...lower and check for obstructions interfering with the raising mechanism Replace the vent cover or cabinet blower and make sure it is properly centered over the opening on the front of the raised vent...

Страница 17: ...iring Diagram Airflow CFM Cubic feet minute Static pressure inches of water 0 1 0 2 0 3 0 4 0 5 0 100 200 300 400 500 600 CABP3 Blower Performance POWER CONTROL CIRCUIT BOARD TO PUSH BUTTON CIRCUIT BO...

Страница 18: ...16 Notes...

Страница 19: ......

Страница 20: ...Dacor 600 Anton Blvd Suite 1000 Costa Mesa CA 92626 Phone 800 793 0093 Fax 626 403 3130 www Dacor com...

Отзывы: