Figure 3-21 Installing the Handle of the RG-S8606 Switch
Installing Cable Management Bracket
To install cable management bracket for RG-S8610/S8606 B, perform the following steps:
1)
For S8610: Remove the blank panel of the cable management bracket by loosening the captive screws with a flat
screwdriver and the cross screws with a Phillips screwdriver.
Figure 3-22 Installing the Cable Management Bracket for RG-S8610
Содержание RG-S8606 B
Страница 1: ...RG S8600 Series Switch Hardware Installation and Reference Guide V1 78 ...
Страница 58: ...Figure 2 3 Moving the RG S8606 Switch Figure 2 4 Moving the RG S8606 B Switch ...
Страница 62: ...Figure 2 6 Ventilation of RG S8614 ...
Страница 63: ...Figure 2 7 Ventilation of RG S8610 Figure 2 8 Ventilation of RG S8606 ...
Страница 76: ...Figure 3 8 Installing the Power Supply of the RG S8606 Switch ...
Страница 92: ...Figure 3 34 Board Components of the RG S8610 Figure 3 35 Board Components of RG S8606 ...
Страница 116: ......