
3
Section
S
I n s t r u c t i o n s f o r U s e
a n d M a i n t e n a n c e
Outcome of aerial platform testing before delivery to the client:
Ref. UNI EN 280 and internal testing procedures
Type of machine………………………………….
Manufacture number…………………………
Type of test
Outcome
Notes
Functional verification
, carried out on the
basis of a specific
report/final machine testing
plan
positive negative
Safety device testing
: verification of correct
operation
positive negative
Functioning testing
(110% of the nominal
load at nominal speed in the various expected
machine configurations)
positive negative
Static overloading test
positive negative
Verification of machine plates and
documentation
positive negative
Date………………………..
Stamp and Signature:………………………………..
UM1046_GB
Содержание B-LIFT PRO Series
Страница 6: ...Instructions for Use and Maintenance Page left empty on purpose...
Страница 14: ...Instructions for Use and Maintenance Section A PAGE LEFT EMPTY ON PURPOSE...
Страница 36: ...Instructions for Use and Maintenance Section C 6 PAGE LEFT EMPTY ON PURPOSE...
Страница 40: ...Instructions for Use and Maintenance Section C 10 PAGE LEFT EMPTY ON PURPOSE...
Страница 100: ...Instructions for Useand M a i n t e n a n c e Section F 28 PAGE LAISSEE VOLONTAIREMENT VIDE...
Страница 101: ...Section G Anomalies index Troubleshooting 2...
Страница 104: ...Instructions for Useand M a i n t e n a n c e Section G 4 Page left empty on purpose...
Страница 119: ...15 Section H CHAINS LUBRIFICATION CHAINS TIGHTNESS ADJUSTMENT CHAIN WEAR CHECK CHAINS MAINTENANCE pag 16 pag 17 pag 18...
Страница 126: ...22 Section H PAGE INTENTIONALLY BLANK...
Страница 127: ...Section index Demolition 2 Elimination 3 Section H1 Maintenance...
Страница 130: ...Use and Maintenance instructions 4 Section H PAGE LEFT EMPTY ON PURPOSE...
Страница 148: ...4 Section S Instructions for Use and Maintenance PAGE LEFT EMPTY ON PURPOSE...