![CTC Union GSi 16 Скачать руководство пользователя страница 43](http://html1.mh-extra.com/html/ctc-union/gsi-16/gsi-16_installation-and-maintenance-manual_2693361043.webp)
43
CTC GSi 16
E
L
3
A
E
L
2
B
E
L
2
A
E
L
1
B
E
L
1
A
On
RE
S
E
RV
8.2 Checking connected sensors
If any sensor is incorrectly connected, a message will appear on the display,
e.g. “Alarm: [E030] sensor out”. If several sensors are incorrectly connected,
the different alarms are displayed on different rows.
If no alarm is displayed, the sensors are connected correctly.
8.3 Pressure/level switch
The pressure/level switch is connected to blocks G73 and G74 and then
defined under the Installer/Define system/Def Heat pump menu.
8.4 Installing a backup power supply
The DIP switch on the relay card (A2) is used to set the backup power
supply. The DIP switch is marked “RESERV” (BACKUP).
When the switch is set to ON, the step is actively operating in backup
heating mode.
Factory-set value 2.1 KW distributed across 3x400 V. Adjust the value
according to the needs and capacity of the building.
3x400 V
Relay
EL3A
EL2B
EL2A
EL1B
EL1A
Factory setting
ON
OFF
ON
OFF
ON
Current
5.2 (A)
10 A
2.6 A
10 A
1.3 A
Output
1.2 kW
2.3 kW.
0.6 kW.
2.3 kW.
0.3 kW.
Example for 1.2+0.6+0.3 = 2.1 kW.
(Factory-set value)
230 V 1N~
Sensor (B46) is connected to the relay card (A2) at terminal block G65–G66.
Circulation pump G46 is connected to the following terminal blocks:
Phase:
brown
Terminal block A:11
Zero:
blue
Earth:
yellow/green
Check the function by test running the pump in menu “Installer/Service/
Function test” in the control system.
8.5 Pump Diff thermostat function (G46) on/off
Содержание GSi 16
Страница 6: ...6 CTC GSi 16...
Страница 48: ...48 CTC GSi 16 8 13 Tank schematic diagram A2...
Страница 49: ...49 CTC GSi 16...
Страница 50: ...50 CTC GSi 16 8 14 HP cooling module schematic diagram A5...
Страница 51: ...51 CTC GSi 16...
Страница 52: ...52 CTC GSi 16 8 15 Expansion card accessory schematic diagram A3 a CTC EcoZenith i350 CTC EcoVent i350F...
Страница 53: ...53 CTC GSi 16...
Страница 54: ...54 CTC GSi 16 M GF B25 B26 Y21 B5 G20 B24 B23 B27 B28 G11 G5 B102 B18...
Страница 61: ...61 CTC GSi 16...
Страница 119: ......
Страница 120: ...Enertech AB P O Box 309 SE 341 26 Ljungby Sweden www ctc se www ctc heating com 012 162 205 94 1 06 02 2019...