![CTC Union GSi 16 Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/ctc-union/gsi-16/gsi-16_installation-and-maintenance-manual_2693361020.webp)
20
CTC GSi 16
4. Important to
remember!
Check the following in particular on delivery and installation:
4.1
Transportation
Transport the unit to the installation site before removing the packaging.
Handle the product in the following manner:
• Forklift
• Lifting eye that has been fitted to the lifting sleeve on top of the product
in the expansion connection.
• Lifting band around the pallet.
NB:
Can only be used with the
packaging on.
Remember that the product has a high centre of mass and should be
handled carefully.
The product must be transported and stored upright.
4.2 Positioning
• Remove the packaging and check before installation that the product
has not been damaged in transit. Report any transport damage to the
carrier.
• Place the product on a solid foundation, preferably made of concrete.
If the product needs to be placed on a soft carpet, base plates
must be placed under the adjustable feet.
• Avoid placing the heat pump in rooms where the walls are of lightweight
design, as people in the adjoining room may be disturbed by the
compressor and vibrations.
• Remember to leave a service area of at least 1 metre in front of the
product.
• The product must not be placed below floor level either.
4.3 Recycling
• The packaging must be deposited at a recycling station or with the
installation engineer for correct waste management.
• Obsolete products must be disposed of correctly and transported to a
waste station or distributor/retailer offering this service.
It is very important that the product’s refrigerant is disposed of
correctly.
Disposal of the product as household waste is not permitted.
• It is very important that the product’s refrigerant, compressor oil and
electric/electronic components are disposed of correctly.
4.4 After commissioning
• The installation engineer advises the property owner on the construction
and servicing of the system.
• The installation engineer fills in a checklist and contact information – the
customer and installation engineer sign the list, which the customer
keeps.
Содержание GSi 16
Страница 6: ...6 CTC GSi 16...
Страница 48: ...48 CTC GSi 16 8 13 Tank schematic diagram A2...
Страница 49: ...49 CTC GSi 16...
Страница 50: ...50 CTC GSi 16 8 14 HP cooling module schematic diagram A5...
Страница 51: ...51 CTC GSi 16...
Страница 52: ...52 CTC GSi 16 8 15 Expansion card accessory schematic diagram A3 a CTC EcoZenith i350 CTC EcoVent i350F...
Страница 53: ...53 CTC GSi 16...
Страница 54: ...54 CTC GSi 16 M GF B25 B26 Y21 B5 G20 B24 B23 B27 B28 G11 G5 B102 B18...
Страница 61: ...61 CTC GSi 16...
Страница 119: ......
Страница 120: ...Enertech AB P O Box 309 SE 341 26 Ljungby Sweden www ctc se www ctc heating com 012 162 205 94 1 06 02 2019...