20
Cranesmart LMI Version R9
Hydraulic Boom Linerider Installation Instructions
Important note: The linerider component should be
located on the top of the boom and as close to the
dead end section boom tip as possible
– see
illustration.
Installation steps
1. Affix the bolt at the tip of the base section (dead
section) of the hydraulic boom as illustrated to the
right. Select a location so that the swing arm angle
with respect to the boom will not exceed 30° during
normal operation of the crane. The linerider should be
located on the top of the boom and as close to the
dead end section boom tip as possible.
2. Attach the swing arm to the bolt.
3. Run the hoist line through the linerider as per
instructions on page 23 of this manual.
4. Check to ensure that the linerider has freedom of
movement from side to side.
Содержание LMI System
Страница 1: ...Cranesmart Systems LMI System User Manual May 11 2015 Rev 9...
Страница 23: ...22 Cranesmart LMI Version R9...
Страница 43: ...42 Cranesmart LMI Version R9 Basic Wiring Diagram...
Страница 45: ...44 Cranesmart LMI Version R9 Junction Box Wiring Diagram...
Страница 47: ...46 Cranesmart LMI Version R9 Alarm Hub Wiring Diagram...
Страница 91: ...90 Cranesmart LMI Version R9 Technical Specifications 7 500lb single line pull load cell...
Страница 92: ...91 Cranesmart LMI Version R9 15 000 single line pull load cell...
Страница 93: ...92 Cranesmart LMI Version R9 25 000lb single line pull load cell...
Страница 94: ...93 Cranesmart LMI Version R9 40 000lb single line pull load cell...
Страница 95: ...94 Cranesmart LMI Version R9 50 000lb single line pull load cell...
Страница 96: ...95 Cranesmart LMI Version R9 80 000lb single line pull load cell...
Страница 97: ...96 Cranesmart LMI Version R9 Anti 2 Block Switch...
Страница 98: ...97 Cranesmart LMI Version R9 Boom Angle Transducer...
Страница 99: ...98 Cranesmart LMI Version R9 Display Panel...
Страница 100: ...99 Cranesmart LMI Version R9 Alarm Hub...
Страница 101: ...100 Cranesmart LMI Version R9 Wind Speed Transducer...