Positioning the boiler .........................................19
Hydraulic connections .......................................20
Flushing the system ..............................................20
Connection of the heating circuit ...........................20
Connecting the expansion vessel .........................21
Connecting the condensate discharge pipe ..........21
Gas connection ...................................................22
Classification .........................................................22
Outlets ...................................................................23
Lengths of the air/flue gas pipes ...........................24
Additional Directives ..............................................25
Connection of the combustion gas exhaust
pipe .......................................................................26
Electrical connections ........................................26
Control unit ............................................................26
Recommendations ................................................27
Standard control PCB ...........................................28
Connecting the pump ............................................28
Connecting a third party control unit .....................30
Connecting the outside temperature sensor ........31
Connect frost protection ........................................32
Connecting the calorifier sensor/thermostat .........33
PC/Laptop connection ...........................................33
Shutdown input .....................................................33
Release input ........................................................34
Optional electrical connections ........................34
Box for the control PCBs .......................................34
Connection options for the 0-10 V control PCB
(IF-01) ...................................................................34
Connection possibilities for the PCB (SCU-
S02) .......................................................................36
Connection possibilities for the PCB (SCU-
S03) .......................................................................38
Connection possibilities for the PCB (SCU-
X01) .......................................................................38
Connection possibilities for the PCB (SCU-
X02) .......................................................................39
Connection possibilities for the PCB (SCU-
X03) .......................................................................40
Connection possibilities for the PCB (c-Mix) .........41
4.10 Electrical diagram ...............................................42
4.11 Filling the system ...............................................43
Water treatment ....................................................43
Filling the siphon ...................................................43
Filling the system ..................................................44
Contents
250413 - 123157-03
2
Содержание Quinta Pro 115
Страница 7: ...250413 123157 03 5 ...
Страница 88: ...10 Checklists Quinta Pro 30 45 65 90 115 86 250413 123157 03 ...
Страница 89: ...Quinta Pro 30 45 65 90 115 10 Checklists 250413 123157 03 87 ...
Страница 90: ...10 Checklists Quinta Pro 30 45 65 90 115 88 250413 123157 03 ...
Страница 91: ......