Control panel .......................................................45
Functions of the keys ............................................45
Meaning of the symbols on the display .................45
Check points before commissioning ................46
Preparing the boiler for commissioning .................46
Gas circuit .............................................................46
Hydraulic circuit .....................................................47
Electrical connections ...........................................47
Commissioning the boiler ..................................47
Gas settings ........................................................49
Adapting to another gas type ................................49
Setting the air/gas ratio (Full load) ........................50
Setting the air/gas ratio (Part load) ......................51
Finalizing work ....................................................52
Reading out measured values ...........................52
Reading the various current values .......................52
Readout from the hour counter and percentage of
successful starts ....................................................53
Status and sub-status ...........................................54
Changing the settings ........................................55
Parameter descriptions .........................................55
Modification of the user-level parameters .............57
Modification of the installer-level parameters ........58
Setting the maximum heat input for central heating
operation ...............................................................58
Return to the factory settings ................................60
Carrying out an auto-detect ...................................61
Setting the manual mode ......................................61
Installation shutdown .........................................62
Antifreeze protection ..........................................62
Checking and maintenance .....................................................................63
Maintenance message ........................................63
Resetting the automatic maintenance
message ................................................................64
Dealing with the next maintenance message and
starting the new maintenance period ....................64
250413 - 123157-03
3
Содержание Quinta Pro 115
Страница 7: ...250413 123157 03 5 ...
Страница 88: ...10 Checklists Quinta Pro 30 45 65 90 115 86 250413 123157 03 ...
Страница 89: ...Quinta Pro 30 45 65 90 115 10 Checklists 250413 123157 03 87 ...
Страница 90: ...10 Checklists Quinta Pro 30 45 65 90 115 88 250413 123157 03 ...
Страница 91: ......