5.5
Finalizing work
1. Remove the measuring equipment.
2. Put the flue gas sampling plug back in place.
3. Refit the front panel. Tighten the two screws by a quarter turn.
4. Push key
>
to return the boiler to normal operating mode.
5. Raise the temperature in the heating system to approximately
70°C.
6. Shut down the boiler.
7. After about 10 minutes, vent the air in the heating system.
8. Switch on the boiler.
9. Check the tightness of the flue gases evacuation and air inlet
connections.
10.Checking the hydraulic pressure. If necessary, top up the water
level in the heating system (recommended hydraulic pressure
between 1.5 and 2 bar).
11.Tick the gas category used on the data plate.
12.Explain the operation of the installation, the boiler and the
regulator to the users.
13.Give all the instruction manuals to the user.
5.6
Reading out measured values
The automatic control unit continuously measures various boiler
parameters. These parameters can be read off the boiler control
panel.
5.6.1.
Reading the various current values
The following current values can be read off the information menu
Q
:
4
5t
= State.
4
5v
= Sub-status.
4
t1
= Flow temperature (°C).
4
t"
= Return temperature (°C).
4
t3
= Calorifier temperature (°C).
4
t4
= Outside temperature (°C) (Only with an outside
temperature sensor).
4
t5
= Solar boiler temperature (°C).
4
5p
= Internal set point (°C).
4
fl
= Ionization current (µA).
4
Mf
= Fan speed in rpm.
4
pr
= Water pressure (bar).
4
p;
= Supplied relative heat output (%).
T001522-A
5. Commissioning
Quinta Pro 30 - 45 - 65 - 90 - 115
52
250413 - 123157-03
Содержание Quinta Pro 115
Страница 7: ...250413 123157 03 5 ...
Страница 88: ...10 Checklists Quinta Pro 30 45 65 90 115 86 250413 123157 03 ...
Страница 89: ...Quinta Pro 30 45 65 90 115 10 Checklists 250413 123157 03 87 ...
Страница 90: ...10 Checklists Quinta Pro 30 45 65 90 115 88 250413 123157 03 ...
Страница 91: ......