Checking the hydraulic pressure ...........................65
Checking the ionization current .............................65
Checking the tightness of the flue gas evacuation and
air inlet connections ..............................................65
Checking combustion ............................................66
Checking the automatic air vent ............................67
Checking the siphon ..............................................67
Checking the burner and cleaning the heat
exchanger .............................................................68
Specific maintenance operations ......................69
Inspection of the ignition electrode ........................69
Replacing the non-return valve .............................70
Assembling the boiler ............................................70
Error codes ..........................................................71
Shutdowns and lock-outs ..................................74
Blockage ...............................................................74
Blocking .................................................................74
Error memory ......................................................76
Error readout memorised ......................................77
Deletion of the error display ..................................78
General ................................................................79
Spare parts ..........................................................79
10.1 Checklist for commissioning .............................84
10.2 Checklist for periodic inspection and
maintenance ........................................................85
Contents
250413 - 123157-03
4
Содержание Quinta Pro 115
Страница 7: ...250413 123157 03 5 ...
Страница 88: ...10 Checklists Quinta Pro 30 45 65 90 115 86 250413 123157 03 ...
Страница 89: ...Quinta Pro 30 45 65 90 115 10 Checklists 250413 123157 03 87 ...
Страница 90: ...10 Checklists Quinta Pro 30 45 65 90 115 88 250413 123157 03 ...
Страница 91: ......