10 Checklists
10.1 Checklist for commissioning
No. Work to be undertaken for commissioning
Attachment / Measured
values
1
Filling the central heating system with water and checking the water pressure
2
Fill the siphon with water
3
Vent the air in the heating system
4
Checking the water-side connections for tightness
5
Checking the type of gas supplied. Checking that the boiler is suitable for the gas supplied?
6
Checking the gas supply pressure
7
Checking the capacity of the gas meter
8
Checking the tightness of the connections and the gas pipes
9
Purge the gas supply pipe of the boiler
10 Checking the electrical connections
11 Checking the air supply connections and flue gas discharge connections
12 Checking the functioning and operational status of the boiler
13 Checking the air/gas ratio
14 Remove the measuring device and close the measurement points
15 Correctly fit the front housing of the boiler
16 Attaching the Gas Type sticker
17 Set the room thermostat or the regulator
18 Instruct the user and hand over the necessary documents
19 Fill in the guarantee card together with the user
20 Confirmation of commissioning
Date
(dd-mm-yy)
Company name, signature of engineer
10. Checklists
Quinta Pro 30 - 45 - 65 - 90 - 115
84
250413 - 123157-03
Содержание Quinta Pro 115
Страница 7: ...250413 123157 03 5 ...
Страница 88: ...10 Checklists Quinta Pro 30 45 65 90 115 86 250413 123157 03 ...
Страница 89: ...Quinta Pro 30 45 65 90 115 10 Checklists 250413 123157 03 87 ...
Страница 90: ...10 Checklists Quinta Pro 30 45 65 90 115 88 250413 123157 03 ...
Страница 91: ......