66
4.
If the inverter is the
last
Modbus device in the daisy chain, make sure the
Modbus termination switch S1 is in the ON position enabling Modbus
termination. Do
not
turn the switch to the ON position in any other inverters
of the daisy chain. If there is only one inverter, the Modbus termination switch
S1 should be set to ON.
5.
The shield of the individual cables must be open (not connected to
ground) on one end
– the other end of the shield must be grounded.
Failure to follow this installation practice will increase lightning surge
damage to the inverter and will void the warranty.
Содержание SCA50KTL-DO/US-480
Страница 2: ......
Страница 6: ......
Страница 53: ...47 Figure 3 24 Bypass Terminal option installed within the Standard wirebox ...
Страница 139: ...133 Figure 10 1 CPS SCA50KTL kW and kVA derating curves of PV input voltage ...
Страница 140: ...134 Figure 10 2 CPS SCA60KTL kW and kVA derating curves of PV input voltage ...
Страница 141: ...135 Figure 10 2 CPS SCA60KTL Reactive Power Capability ...