2. Grid Connection Rule.
Multiple grid standards are available.
Press
and
to select the corresponding grid standard
required for the installation and press the
ENT
key
.
Grid Connection Rule
CA Rule-21/UL 1741 SA
HECO-ML
HECO-HM
IEEE1547
NONE
Figure 4-10 Setting Grid Rule
INSTRUCTION:
Please check with your local electric utility supply company before
selecting a grid standard. If the inverter is operated with an incorrect
grid standard, the electric utility supply company may cancel the
interconnection agreement.
Placing the inverter into operation before the overall system complies
with the national codes, rules and safety regulations of the
application is also not permitted.
Содержание SCA50KTL-DO/US-480
Страница 2: ......
Страница 6: ......
Страница 53: ...47 Figure 3 24 Bypass Terminal option installed within the Standard wirebox ...
Страница 139: ...133 Figure 10 1 CPS SCA50KTL kW and kVA derating curves of PV input voltage ...
Страница 140: ...134 Figure 10 2 CPS SCA60KTL kW and kVA derating curves of PV input voltage ...
Страница 141: ...135 Figure 10 2 CPS SCA60KTL Reactive Power Capability ...