1-1
Introduction
1
This document provides step-by-step instructions on how to install a CT2023 ChargePoint® Charging
Station. As shown here, the CT2023 ships in five boxes:
Before installing stations
Before you begin installing a CT2023 charging station as described in this document, you must:
• ensure that the appropriate wiring, circuit protection, and metering is in place at the installation
location (see wiring diagram on page 1-3 of this document)
• ensure that the type of modem in each station you are installing is compatible with the type of modem
coverage available at the installation site (CDMA or GPRS)
• review the CT2023 Charging Stations Data Sheet (available at www.coulombtech.com/support/)
• review the mounting template (provided in this document and in the box containing the station’s body)
IMPORTANT:
A PDF version of the mounting template is also available at
www.coulombtech.com/support/. When printing this version, print at 100% scale using 11” x 17”
paper and verify at least one dimension to ensure accuracy.
It is also recommended that you thoroughly review this document to familiarize yourself with the contents
of each shipping box, and the required installation steps.
Install FIRST
See Chapter 2
Install SECOND
See Chapter 3
Install LAST
See Chapter 4
Head
Assembly
*NOTE:
The screws used to mount the holsters are included in the box containing the bollard mount AND in the boxes
containing the holsters. Use those provided in the box containing the bollard mount.
Bollard mount, cable hangers,
& mounting accessories*
Cable Assembly 2
and Right Holster
Cable Assembly 1
and Left Holster
Wall Mount
Bracket