2-1
Installing the Wall Mount
2
Before you begin
In addition to the contents of the CT2023 wall mount’s shipping box, you will need the following:
Overview of steps
Installing the CT2023 ChargePoint
®
Charging Station’s body assembly involves a few simple steps:
1. Check boxes for correct contents
(see page 2-2)
2. Remove channel struts from body
(see page 2-4)
3. Install channel struts
(see page 2-5)
4. Attach wall mount bracket
5. Remove front panel
(see page 2-7)
6. Remove terminal block from main body
(see page 2-8)
7. Drill holes in main body
8. Attach body assembly to wall bracket
(see page 2-10)
9. Attach coupler and connect conduit
(see page 2-11)
10. Reattach terminal block to main body
(see page 2-12)
11. Connect wires to wiring terminals
12. Replace front panel
(see page 2-14)
These steps are detailed in the remainder of this chapter. When you have completed these steps, you will
be ready to install the holster and cable assembly as described in Chapter 3.
• Hammer drill
• 3/8” masonry drill bit
• 3/8” drive ratchet with extension
• 9/16” deep hex socket
• 7/16” hex socket
• #3 Phillips screwdriver
• T25 Tamper-resistant Torx driver
• ¾” (trade size) conduit coupler
• Silicone sealant, electrical grade