32 - Installation - Quark Installation
Connect the breathing valve and/or the flowmeter to the Quark
Connecting the breathing valve (if present) and the flowmeter to the Quark rear panel:
5.
Breathing Valve - The two tubes coming from the breathing valve must be connected to connectors #3 and 7 on the rear panel of the Quark
(Breathing valve and Demand valve). Demand valve pneumatic connection is from S/N 2014041001
6.
Sampling Line - Must be connected to connector #2 of the rear panel of the Quark (Sampling)
7.
PNT X9 - Pneumatic tubes from the flowmeter must be connected to connector #1 of the rear panel of the Quark (Pneumotach MIP/MEP - P01)
8.
Turbine - The cable from the turbine must be connected to connector #15 of the rear panel of the Quark (Turbine)
Assemble the VO
2
max mask and the turbine flowmeter
1
2
3
4 5 6
7
8 9
10
11 12
13
15
14
16
17
18
19
20
21
22
Содержание Quark CPET
Страница 2: ......
Страница 8: ......
Страница 9: ...Getting Started...
Страница 25: ...Installation...
Страница 43: ...System Cleaning Maintenance...
Страница 48: ...46 System Cleaning Maintenance Spirometry Tests Spirometry Tests...
Страница 56: ...54 System Cleaning Maintenance CPET RMR Tests CPET RMR Tests...
Страница 63: ...System Cleaning Maintenance Canopy test 61 Canopy test...
Страница 68: ...66 System Cleaning Maintenance Mixing Chamber Test Mixing Chamber Test...
Страница 77: ...System Cleaning Maintenance Rocc test 75 Rocc test...
Страница 83: ...Appendix...
Страница 101: ......