
Operator’s Manual: Bean Tender-Swing Conveyor (BTS)
08.2015
3-17
3.9 STORAGE
After the season’s use or when the unit will not be
used for an extended period of time, the tender
should be thoroughly inspected and prepared for
storage.
Repair or replace any worn or damaged components.
This will prevent any unnecessary down time at the
start of next season.
To have a long, trouble free life, this procedure should
be followed when preparing the unit for storage:
1. Remove all residual material from compartments
and tube.
2. Inspect all moving or rotating parts to see if
anything has become entangled in them. Remove
the entangled material.
3. Thoroughly wash the tender to remove all dirt,
mud, debris and residue.
- Wash inside the compartments and around the
gates.
- Clean inside the conveyor tube.
- Wash the top and under the belts.
4. Lubricate all grease fittings and bearings.
Refer to Section 4.2
Make sure that all grease cavities have been
filled with grease to remove any water residue
from the washing. This also protects the bearing
seals.
5. Check condition of drive belt and pulleys. Adjust
or replace as required.
6. Check condition of conveyor belt. Replace if
necessary.
7. Touch up all paint nicks and scratches to prevent
rusting.
8. Remove ignition key and store it in a secure
location.
9. Remove the battery, before storing the tender.
- Be sure it is fully charged, check monthly.
- Store it inside.
- Do not sit the battery on a cold, concrete floor.
10. Select a storage area that is dry, level and free
of debris.
If the machine cannot be placed inside, cover the
gas engine with a water proof tarpaulin and tie
securely in place.
11. Store machine in an area away from human
activity.
12. Do not allow children to play on or around the
stored machine.
IMPORTANT:
If the tender has been stored for more than 6 months,
run the engine for 2-3 minutes. This warms the
oil, then change it while still warm to remove any
condensation.
Содержание BTS-295
Страница 1: ...BEAN TENDER Models BTS 295 BTS 410 WT 295 OPERATOR S MANUAL...
Страница 4: ...This page intentionally left blank...
Страница 8: ...Operator s Manual Bean Tender Swing Conveyor BTS 1 2 08 2015 This page intentionally left blank...
Страница 36: ...Operator s Manual Bean Tender Swing Conveyor BTS 3 18 08 2015 This page intentionally left blank...
Страница 50: ...Operator s Manual Bean Tender Swing Conveyor BTS 4 14 08 2015 This page intentionally left blank...
Страница 56: ...Operator s Manual Bean Tender Swing Conveyor BTS 6 2 08 2015 This page intentionally left blank...