
Operator’s Manual: Bean Tender-Swing Conveyor (BTS)
3-10
08.2015
3.3 MACHINE BREAK-IN
There is no operational restrictions on the tender
when used for the first time.
The conveyor belt’s alignment is set at the factory, to
track correctly without carrying a load. It is important
to check alignment and make adjustments, if
required, during the first few minutes of operation.
It is recommended that the following procedural and
mechanical items be checked:
Before Starting Work:
1. Read the tender, and engine operator manuals.
2. Review and the Pre-Operation Checklist before
starting machine.
After Operating or Transporting for 1/2 hour:
3. Check engine fluid levels; fuel and engine oil.
4. Lubricate the points defined in the Section 4.2.
5. Check the tension and alignment of the conveyor
belt.
6. Check the drive belt’s tension and alignment.
7. Check hardware and fasteners; tie-downs, all
fasteners and wheel bolts. Tighten bolts to their
specified torque.
8. Check the remote control. Be sure that it
functions properly.
9. Check that the trailer brakes function.
10. Check that the trailer’s Break-Away Switch
functions, and its battery is at full charge.
After 10 Hours:
11. Go to the service schedule in the Servicing
Intervals section.
Refer to the engine manual for more specific
instructions.
3.4 PRE-OPERATION CHECKLIST
Efficient and safe operation of the tender requires that
each operator reads and understands the operating
procedures.
It is important for both the personal safety and
maintaining the good mechanical condition of the
tender and its conveyor that the following checklist
is followed.
Before operating the tender and each time thereafter,
the following List should be checked:
1. Check work site. Clean up the area to prevent
slipping or tripping.
2. Check engine fluid levels.
3. Be sure the battery is fully charged. If needed,
charge the battery before connecting it with the
battery cables.
4. Lubricate and service the unit as per the schedule
outlined in the Service and Maintenance Section.
5. Check that all guards are installed, secured and
functioning as intended. Do not operate with
missing or damaged shields.
6. Check the drive and conveyor belts. Tension and
align as required.
7. Check that the belts are not frayed or damaged.
8. Check that discharge and hopper areas are free
of obstructions.
Содержание BTS-295
Страница 1: ...BEAN TENDER Models BTS 295 BTS 410 WT 295 OPERATOR S MANUAL...
Страница 4: ...This page intentionally left blank...
Страница 8: ...Operator s Manual Bean Tender Swing Conveyor BTS 1 2 08 2015 This page intentionally left blank...
Страница 36: ...Operator s Manual Bean Tender Swing Conveyor BTS 3 18 08 2015 This page intentionally left blank...
Страница 50: ...Operator s Manual Bean Tender Swing Conveyor BTS 4 14 08 2015 This page intentionally left blank...
Страница 56: ...Operator s Manual Bean Tender Swing Conveyor BTS 6 2 08 2015 This page intentionally left blank...