20
2. Mount valve unit.
Important:
if the collector pipe is mounted before the valve unit, steps 3 to 6 must be done first.
• Remove protective plug from the steam pipe connector of the valve unit.
• This step must be carried out only if mounting set for insulated ducts is used: Cut length of
the supporting tubes to duct wall thickness “L”, then insert the tubes into the fixing holes.
• Fix valve unit to the duct as shown below using the screws, washers and nuts. Before tighten
-
ing, centrically align the bores of the duct and the valve unit.
Esco 10
Esco 20
Esco 30
1
M8 x *
Wrench size 13 mm
M12 x *
Wrench size 19 mm
2
ø24/8.4 x 2 mm
ø37/13 x 3 mm
3
M8 x 0.8d
M12 x 0.8d
* length as required
Esco 10
Esco 20
Esco 30
1
M8 x 70 mm **
M8 x 100 mm **
Wrench size 13 mm
M12 x 70 mm **
M12 x 100 mm **
Wrench size 19 mm
2
ø24/8.4 x 2 mm
ø37/13 x 3 mm
3
ø12/8.5 x 45 mm **
ø12/8.5 x 100 mm **
ø16/13 x 45 mm **
ø16/13 x 70 mm **
4
M8 x 0.8d
M12 x 0.8d
** as ordered
1
2
3
L
L
1
2
3
4
Screws washers and nuts for non insulated ducts
(by client)
Mounting set for insulated ducts
Содержание Esco
Страница 1: ...INSTALLATION INSTRUCTIONS Steam humidification system 1117775 EN 1310 Condair Esco L...
Страница 2: ......
Страница 14: ...14 5 Seal the bores inside the duct with silicone free sealant...
Страница 24: ...24 5 Seal the bores inside the duct with silicone free sealant...
Страница 40: ...40 5 Seal the bores inside the duct with silicone free sealant...
Страница 50: ...Notes...
Страница 51: ...Condair Ltd Printed in Switzerland Technical modifications reserved...