Tr o u b l e s h o o t i n g l
6-43
6
Tr
ou
ble
sh
oo
tin
g
Replacing the Desiccant Wheel Motor
(W600 - 1000)
1
Stop the dryer, disconnect and lockout the main power.
2
Remove side panels.
3
Disconnect wiring to the
motor.
4
Remove the pivot bolt
securing the belt tension-
er to the motor bracket.
Be sure to retain the flat
washers located between
the tensioner and bracket.
Disconnect the spring and
remove the tensioner.
5
Remove the belt from the motor pulley,
then remove the pulley from the motor.
6
Remove the screws securing the motor to the upper and lower bracket,
and
remove the motor.
7
Secure the new motor to the bracket.
8
Install the pulley on the new motor,
and position the belt on the pulley.
9
Connect the spring to the tensioner, then secure the tensioner to the motor brack-
et.
Be sure to install flat washers between the motor bracket and the tensioner.
10
Connect the wires to the motor.
11
Connect the power to the dryer.
Turn the dryer on and ensure that the desiccant
wheel is rotating in the correct direction.
12
Replace the side panels.
OFF
O
ON
I
Содержание Carousel Plus UGD043-1216
Страница 7: ...Table of Contents l v...
Страница 8: ...vi l Table of Contents...
Страница 48: ...3 24 l Installation Testing...
Страница 54: ...4 6 l Operation Control Function Flow Charts continued Login Flow Chart...
Страница 55: ...4 O p e r a t i o n Operation l 4 7 Operation Basic Controls...
Страница 56: ...4 8 l Operation Control Function Flow Charts continued Operation Flow Chart 1 continued...
Страница 57: ...4 O p e r a t i o n Operation l 4 9 Control Function Flow Charts continued Operation Flow Chart 2 continued...
Страница 58: ...4 10 l Operation...
Страница 59: ...Operation Dew Point Package Controls 4 O p e r a t i o n Operation l 4 11...
Страница 60: ...Control Function Flow Charts continued Operation Flow Chart 1 4 12 l Operation...
Страница 61: ...Control Function Flow Charts continued Operation Flow Chart 2 4 O p e r a t i o n Operation l 4 13...
Страница 62: ...4 14 l Operation...
Страница 63: ...4 O p e r a t i o n Operation l 4 15 Operation Setup Control...
Страница 64: ...4 16 l Operation Control Function Flow Charts continued continued Setup Flow Chart 1...
Страница 66: ...4 18 l Operation continued Control Function Flow Charts continued Equipment Setup Flow Chart 2...
Страница 164: ...6 46 l Troubleshooting...