3
Installa
tion
I n s t a l l a t i o n l
3-7
Connecting the Main Power
CAUTION:
Always disconnect and lock out the main power sources before making electri-
cal connections. Electrical connections should be made only by qualified personnel.
1
Open the dryer’s electrical enclosure.
Turn the disconnect dial on the dryer door to the
Off or “O” position. Lock out the main power.
See Introduction: How to Use the
Lockout Device for complete lock out information.
Turn the captive screw, and swing the
door open.
2
Insert the main power wire
through the knockout in the side of the enclosure. Secure
the wire with an appropriate strain relief.
IMPORTANT:
Always refer to the
wiring diagrams that came with
your dryer before making electrical
connections.
3
Connect the power wires
to the three terminals at the top of the power disconnect hold-
er.
4
Connect the ground wire
to the ground lug as shown in the photo.
✐
NOTE:
Models
W600-5000 con-
figured with
process heat and a
Heater Pack at the
hopper will require
conduit from the
control panel to
the Heater Pack
.
See the Appendix,
in this User Guide
for more informa-
tion about proper
conduit and cable
size for your
application.
OFF
O
ON
I
✐
NOTE:
Wiring between process air heater, Heater Pack, and dryer where control for this heater is
located is not included. Maximum working distance is 100 feet {30 meters}. Consult Conair or a
qualified electrician to determine gauge of wire required for distance.
Содержание Carousel Plus UGD043-1216
Страница 7: ...Table of Contents l v...
Страница 8: ...vi l Table of Contents...
Страница 48: ...3 24 l Installation Testing...
Страница 54: ...4 6 l Operation Control Function Flow Charts continued Login Flow Chart...
Страница 55: ...4 O p e r a t i o n Operation l 4 7 Operation Basic Controls...
Страница 56: ...4 8 l Operation Control Function Flow Charts continued Operation Flow Chart 1 continued...
Страница 57: ...4 O p e r a t i o n Operation l 4 9 Control Function Flow Charts continued Operation Flow Chart 2 continued...
Страница 58: ...4 10 l Operation...
Страница 59: ...Operation Dew Point Package Controls 4 O p e r a t i o n Operation l 4 11...
Страница 60: ...Control Function Flow Charts continued Operation Flow Chart 1 4 12 l Operation...
Страница 61: ...Control Function Flow Charts continued Operation Flow Chart 2 4 O p e r a t i o n Operation l 4 13...
Страница 62: ...4 14 l Operation...
Страница 63: ...4 O p e r a t i o n Operation l 4 15 Operation Setup Control...
Страница 64: ...4 16 l Operation Control Function Flow Charts continued continued Setup Flow Chart 1...
Страница 66: ...4 18 l Operation continued Control Function Flow Charts continued Equipment Setup Flow Chart 2...
Страница 164: ...6 46 l Troubleshooting...