4-30
l O p e r a t i o n
Control Function Descriptions
(continued)
Secondary Hopper Loader Screen (optional)
To access the Secondary Hopper Loader Screen:
1
Press the "Secondary Loader" button
located on the right side of the screen.
The Secondary Hopper Loader screen allows the user to set the load time, dump time,
purge time and alarm checks of the optional receiver. If the user is logged-in at the
proper security level, these settings can be changed from this screen.
See specific
receiver’s manual for correct settings of these parameters.
Once the correct times
have been entered, press the “Enabled” button to activate the optional secondary
receiver. Pressing the “Disabled” button will de-activate the receiver. The receiver’s
current status will be displayed under the receiver’s icon in the top left side of this
screen.
The user can also view the other system parameters, start the system, stop the system,
initiate a system cooldown or return to the "Login" screen by pressing the applicable
buttons on the right of the screen.
NOTE:
Set points boxes are white
with heavy black borders. Set
points can be changed, if the user
has logged in at the proper securi-
ty level, by pressing the set point
boxes. This will launch a pop-up
keypad window that can be used
to change the set point.
See
Operation section entitled,
Example Set Point Change.
After
the new set point value has been
entered, press the
"Enter"
key to
lock in the new set point.
✐
(continued)
Содержание Carousel Plus UGD043-1216
Страница 7: ...Table of Contents l v...
Страница 8: ...vi l Table of Contents...
Страница 48: ...3 24 l Installation Testing...
Страница 54: ...4 6 l Operation Control Function Flow Charts continued Login Flow Chart...
Страница 55: ...4 O p e r a t i o n Operation l 4 7 Operation Basic Controls...
Страница 56: ...4 8 l Operation Control Function Flow Charts continued Operation Flow Chart 1 continued...
Страница 57: ...4 O p e r a t i o n Operation l 4 9 Control Function Flow Charts continued Operation Flow Chart 2 continued...
Страница 58: ...4 10 l Operation...
Страница 59: ...Operation Dew Point Package Controls 4 O p e r a t i o n Operation l 4 11...
Страница 60: ...Control Function Flow Charts continued Operation Flow Chart 1 4 12 l Operation...
Страница 61: ...Control Function Flow Charts continued Operation Flow Chart 2 4 O p e r a t i o n Operation l 4 13...
Страница 62: ...4 14 l Operation...
Страница 63: ...4 O p e r a t i o n Operation l 4 15 Operation Setup Control...
Страница 64: ...4 16 l Operation Control Function Flow Charts continued continued Setup Flow Chart 1...
Страница 66: ...4 18 l Operation continued Control Function Flow Charts continued Equipment Setup Flow Chart 2...
Страница 164: ...6 46 l Troubleshooting...