I n s t a l l a t i o n l
3-13
3
Installa
tion
Recommended Water Flow Rates
Dryer Model
gal./min. {liters/min.}
600 15 {56.8}
800 15 {56.8}
1000 20 {75.7}
1300 25 {94.6}
1600 25 {94.6}
2000 25 {94.6}
2400 25 {94.6}
3200 30 {113.6}
4000 30 {113.6}
5000 30 {113.6}
Connecting the Aftercooler and
Optional Precooler
(W600 - 1000)
The aftercooler and/or optional precooler require a source of city, tower, or chiller water
and a discharge or return line. You can use water at temperatures of 45 to 85°F {7 to 29°C}.
The water flow should be at least 3 gal/min {11.4 liters/min}.
1
Connect the water supply line to
the aftercooler or precooler inlet.
If a manual shut off valve is used,
it should be mounted on the inlet
line. Conair recommends that both the
supply and return water lines have a shut
off valve.
2
Connect the water discharge or
return line to the aftercooler or
precooler outlet.
Aftercooler Inlet
Aftercooler Outlet
IMPORTANT:
Make the
water supply and
discharge / return
connections with
flexible hoses at
least 24 in. (61 cm)
long. This allows you
to easily remove the
aftercooler assembly
for cleaning.
✒
TIP:
If an optional
flow control is also
being installed with
the aftercooler, the
manual shut off valve
should be installed
on the inlet line for
the flow control.
NOTE:
Models
W600-1000 dryer
aftercooler and dry
air delivery configu-
ration shown.
Location on larger
models are differ-
ent. Refer to the
labeling on your
dryer.
✐
IMPORTANT:
Turn the water off when the dryer is
not in use to prevent condensation.
Содержание Carousel Plus UGD043-1216
Страница 7: ...Table of Contents l v...
Страница 8: ...vi l Table of Contents...
Страница 48: ...3 24 l Installation Testing...
Страница 54: ...4 6 l Operation Control Function Flow Charts continued Login Flow Chart...
Страница 55: ...4 O p e r a t i o n Operation l 4 7 Operation Basic Controls...
Страница 56: ...4 8 l Operation Control Function Flow Charts continued Operation Flow Chart 1 continued...
Страница 57: ...4 O p e r a t i o n Operation l 4 9 Control Function Flow Charts continued Operation Flow Chart 2 continued...
Страница 58: ...4 10 l Operation...
Страница 59: ...Operation Dew Point Package Controls 4 O p e r a t i o n Operation l 4 11...
Страница 60: ...Control Function Flow Charts continued Operation Flow Chart 1 4 12 l Operation...
Страница 61: ...Control Function Flow Charts continued Operation Flow Chart 2 4 O p e r a t i o n Operation l 4 13...
Страница 62: ...4 14 l Operation...
Страница 63: ...4 O p e r a t i o n Operation l 4 15 Operation Setup Control...
Страница 64: ...4 16 l Operation Control Function Flow Charts continued continued Setup Flow Chart 1...
Страница 66: ...4 18 l Operation continued Control Function Flow Charts continued Equipment Setup Flow Chart 2...
Страница 164: ...6 46 l Troubleshooting...