3
Installa
tion
I n s t a l l a t i o n l
3-15
Checking for Proper Air Flow
IMPORTANT:
This procedure must be performed before loading material into the
hopper.
CAUTION:
If the airflow direction is incorrect due to improper phase connection,
material from the hopper can be pulled back into the dryer, causing permanent
damage to this equipment.
1
Turn on the main power to the dryer.
Make sure the dryer’s disconnect dial is in the ON
position. This powers up the control and the display will illuminate.
2
From the Login Screen, press the “Dehumid. Drying” button.
3
Remove the dryer’s side panels.
See Installation section entitled, Opening the Dryer
Doors.
OFF
O
ON
I
WARNING:
All wiring, disconnects, and fuses should be installed by qualified elec-
trical technicians in accordance with electrical codes in your region. Always main-
tain a safe ground. Do not operate the equipment at power levels other than what
is specified on the machine serial tag and data plate.
NOTE:
Users must be
logged in at the
appropriate level in
order to perform this
operational test.
✐
(continued)
Содержание Carousel Plus UGD043-1216
Страница 7: ...Table of Contents l v...
Страница 8: ...vi l Table of Contents...
Страница 48: ...3 24 l Installation Testing...
Страница 54: ...4 6 l Operation Control Function Flow Charts continued Login Flow Chart...
Страница 55: ...4 O p e r a t i o n Operation l 4 7 Operation Basic Controls...
Страница 56: ...4 8 l Operation Control Function Flow Charts continued Operation Flow Chart 1 continued...
Страница 57: ...4 O p e r a t i o n Operation l 4 9 Control Function Flow Charts continued Operation Flow Chart 2 continued...
Страница 58: ...4 10 l Operation...
Страница 59: ...Operation Dew Point Package Controls 4 O p e r a t i o n Operation l 4 11...
Страница 60: ...Control Function Flow Charts continued Operation Flow Chart 1 4 12 l Operation...
Страница 61: ...Control Function Flow Charts continued Operation Flow Chart 2 4 O p e r a t i o n Operation l 4 13...
Страница 62: ...4 14 l Operation...
Страница 63: ...4 O p e r a t i o n Operation l 4 15 Operation Setup Control...
Страница 64: ...4 16 l Operation Control Function Flow Charts continued continued Setup Flow Chart 1...
Страница 66: ...4 18 l Operation continued Control Function Flow Charts continued Equipment Setup Flow Chart 2...
Страница 164: ...6 46 l Troubleshooting...