3
Installa
tion
I n s t a l l a t i o n - Te s t i n g l
3-23
Testing the Installation
3
From the System Control Screen, press the “Start System”
button.
If everything is installed correctly:
•
The regeneration and process blowers turn on.
•
The regeneration heater turns on.
•
The process heater will energize (Heater Pack).
•
The dryer’s desiccant wheel starts turning. If the desiccant wheel does
not turn, verify that the desiccant wheel tie has been removed.
4
From the System Control Screen, press the “Stop System”
button.
If everything is installed correctly:
•
The blowers will continue running as needed to cool the heaters.
(until regeneration heaters are less than 150°F {66°C}).
5
The test is over.
If the dryer performed the normal operating sequences as
outlined, reconnect the material source to the optional hopper receiver and begin
normal operation. If it did not,
refer to the
Troubleshooting
section of the User
Guide
.
Содержание Carousel Plus UGD043-1216
Страница 7: ...Table of Contents l v...
Страница 8: ...vi l Table of Contents...
Страница 48: ...3 24 l Installation Testing...
Страница 54: ...4 6 l Operation Control Function Flow Charts continued Login Flow Chart...
Страница 55: ...4 O p e r a t i o n Operation l 4 7 Operation Basic Controls...
Страница 56: ...4 8 l Operation Control Function Flow Charts continued Operation Flow Chart 1 continued...
Страница 57: ...4 O p e r a t i o n Operation l 4 9 Control Function Flow Charts continued Operation Flow Chart 2 continued...
Страница 58: ...4 10 l Operation...
Страница 59: ...Operation Dew Point Package Controls 4 O p e r a t i o n Operation l 4 11...
Страница 60: ...Control Function Flow Charts continued Operation Flow Chart 1 4 12 l Operation...
Страница 61: ...Control Function Flow Charts continued Operation Flow Chart 2 4 O p e r a t i o n Operation l 4 13...
Страница 62: ...4 14 l Operation...
Страница 63: ...4 O p e r a t i o n Operation l 4 15 Operation Setup Control...
Страница 64: ...4 16 l Operation Control Function Flow Charts continued continued Setup Flow Chart 1...
Страница 66: ...4 18 l Operation continued Control Function Flow Charts continued Equipment Setup Flow Chart 2...
Страница 164: ...6 46 l Troubleshooting...