XSAT7080 X-Band Transceiver
Revision 0
5-25W Installation
MN/XSAT7080.IOM
A–21
Step
Procedures
8
Place a unit on each bracket (1, figure A-2) and secure with four bolts
(2), flat washers (4) and lock washers (6)
9
Position assembled TX switch (1,figure A-15) on bracket (1, figure A-11) and
secure with two screws (4), flat washers (2), and lock washers (3).
Figure A-19. Installation of
XSAT Transceivers
Figure A-20. Redundant
Configuration with Cables
Installed