Step
Procedures
8
Attach bracket (5, figure B-1) to the strap (4) using two nuts (10), two flat
washers, (7), and two splitlock washers (8).
9
Place the assembly against the pole with the strap around the pole and trim the
strap (4) to fit as shown in Figure B-21, using the tin snips.
10
Attach bracket (3, figure B-1) to the strap (4) using two nuts (10), two flat
washers (7), and two splitlock washers (8).
11
Slide tensioner bracket (2) into channel of the top Unistrut bracket (1).
12
Place assembly on the pole.