
Computec
CDD5.0
EN
CDD 5.0: user manual – Rev.01
Page 10/63
3
Installation
Before proceeding to the installation, verify the necessary safety devices:
In addition verify the necessary instruments to perform all the operations:
Be sure to work in full safe conditions, setting the inspection mode on the lift before starting any operation.
3.1
Preliminary mechanical checks
The installation of the door drive has to be performed by expert technical personnel, having all the
professional requirements expected, based on the active law in the installation country.
Before proceeding with the installation of the door drive it is necessary to:
-
Check the correct and good status of the door operator installation:
o
Correct installation of the door panels
o
Correct installation of the carriages
o
Correct installation of the transmission (belt connection, belt)
o
Correct installation of the gear-motors, according to table “- Table 2: compatible motors
data”
-
Check that the panels movement is free, without obstacles overall the complete door space.
-
Check the material of the box:
o
CDD 5.0 door controller
o
Retrofit fixation bracket to be fixed on the controller, in case of retrofit