3-25
Compaq ProLiant 5500 Servers Setup and Installation Guide
For use with Intel Pentium II Xeon processor-based servers only
Writer: Salvo Project: Compaq ProLiant 5500 Servers Setup and Installation Guide Comments: 328470-001\July 1998
File Name: D-CH03.DOC Last Saved On: 7/6/98 4:04 PM
COMPAQ CONFIDENTIAL - NEED TO KNOW REQUIRED
1. For easier handling, first slide the server into the rack, then attach the
cable management arm to the cable management arm bracket. If you
attach the arm before loading the server in the rack, the arm may swing
around and interfere with the loading process.
2. After you have loaded the server into the rack, attach one end of the
cable management arm to the server's cable management arm bracket
using two M6 x 1.0-12L Phillips screws. Align the arm to the bracket as
shown in the following figure.
Figure 3-15. Attaching the cable management arm to the cable management
arm bracket
3. Align the other end of the cable management arm on the outside of the
rear brace of the rack. Align a screw retaining plate on the inside of the
rack. Attach the arm to the rack with two 10-32 x 5/8-inch Phillips
washer-face hex-head screws.
Содержание ProLiant 5500
Страница 8: ......