01/11/12 Page 23
INSTALLATION AND OPERATION MANUAL
CNGE2FE16MS
TECh SUPPORT: 1.888.678.9427
Installation Steps
»
Unpack the CNGE2FE16MS.
»
To hang the CNGE2FE16MS on the wall, please refer to the Wall Mounting section.
»
Ground the CNGE2FE16MS.
»
To power on the CNGE2FE16MS, please refer to the Wiring the Power Inputs section for further
information on how to wire the power. And then the power LED on the CNGE2FE16MS will light
up. Please refer to the LED Indicators section for indication of LED lights.
»
Prepare the appropriate cables for the Ethernet connection.
»
The Ethernet port LED on the CNGE2FE16MS will light up when the cable is connected with
the network device. Please refer to the LED Indicators section for LED light indication.
»
When all connections are set and LED lights all show in normal, the installation is complete.
Note This equipment is intended for use in a Pollution Degree 2 industrial environment.