Installing Transceivers and Cables
•
•
•
•
•
•
•
•
•
Time and Items Required
The installation or replacement procedure for one transceiver takes less than five minutes.
Ensure that the following items are available:
•
Required number of supported RUCKUS-branded transceivers
Refer to the RUCKUS optics family datasheet for the list of supported transceivers and cables.
•
Required number of compatible Ethernet (RJ-45) and fiber-optic cables
•
Optical transceiver extraction tool (for 10-Gbps transceiver only)
NOTE
Most RUCKUS switches come with a transceiver extraction tool and holster. The extraction tool is designed to remove
transceivers from modules where the space is limited.
FIGURE 45 Optical Transceiver Extraction Tool
RUCKUS ICX 7550 Switch Hardware Installation Guide
Part Number: 53-1005648-04
67
Содержание RUCKUS ICX 7550
Страница 10: ...RUCKUS ICX 7550 Switch Hardware Installation Guide 10 Part Number 53 1005648 04 ...
Страница 54: ...RUCKUS ICX 7550 Switch Hardware Installation Guide 54 Part Number 53 1005648 04 ...
Страница 66: ...RUCKUS ICX 7550 Switch Hardware Installation Guide 66 Part Number 53 1005648 04 ...
Страница 76: ...RUCKUS ICX 7550 Switch Hardware Installation Guide 76 Part Number 53 1005648 04 ...
Страница 90: ...RUCKUS ICX 7550 Switch Hardware Installation Guide 90 Part Number 53 1005648 04 ...
Страница 102: ...RUCKUS ICX 7550 Switch Hardware Installation Guide 102 Part Number 53 1005648 04 ...
Страница 108: ...RUCKUS ICX 7550 Switch Hardware Installation Guide 108 Part Number 53 1005648 04 ...
Страница 114: ...RUCKUS ICX 7550 Switch Hardware Installation Guide 114 Part Number 53 1005648 04 ...
Страница 141: ... 2021 CommScope Inc All rights reserved 350 West Java Dr Sunnyvale CA 94089 USA https www commscope com ...