background image

9711IMA-70 

Table of Contents 

 

viii 

3.9.

 

I

NSTALLING 

T

HE 

ADE ................................................................................................................................................................................ 3-24

 

3.9.1.

 

Hoist the ADE ........................................................................................................................................................................... 3-24

 

3.9.2.

 

Connecting the ADE ............................................................................................................................................................. 3-24

 

3.9.3.

 

Remove stow Straps ............................................................................................................................................................. 3-25

 

3.9.4.

 

ADE Final Checks ................................................................................................................................................................... 3-25

 

3.10.

 

I

NSTALLING THE 

B

ELOW 

D

ECKS 

E

QUIPMENT

 ........................................................................................................................................ 3-25

 

3.10.1.

 

General Cautions & Warnings .......................................................................................................................................... 3-25

 

3.10.2.

 

Connecting the BDE AC Power Cables ....................................................................................................................... 3-25

 

3.10.3.

 

Media Xchange Point™ (MXP) Connections ............................................................................................................. 3-25

 

3.10.4.

 

Other BDE connections ...................................................................................................................................................... 3-27

 

3.11.

 

BDE

 

F

INAL 

C

HECKS

 .................................................................................................................................................................................... 3-27

 

3.11.1.

 

Visual/Electrical inspection ............................................................................................................................................... 3-27

 

3.11.2.

 

Electrical - Double check wiring connections ......................................................................................................... 3-27

 

3.12.

 

S

ETUP  

-

  

M

EDIA 

X

CHANGE 

P

OINT

 

(MXP) ......................................................................................................................................... 3-28

 

4.

 

CONFIGURING A COMPUTER FOR THE MXP .......................................................................................................................... 4-1

 

5.

 

SETUP – SHIP’S GYRO COMPASS ..................................................................................................................................................... 5-1

 

5.1.

 

S

ETTING THE 

G

YRO 

T

YPE

 .............................................................................................................................................................................. 5-1

 

5.2.

 

I

F THERE IS 

NO

 

S

HIPS 

G

YRO 

C

OMPASS

 ..................................................................................................................................................... 5-1

 

6.

 

SETUP – TRACKING RECEIVER – VSAT ....................................................................................................................................... 6-1

 

6.1.

 

D

ETERMINING THE 

IF

 

T

RACKING 

F

REQUENCY 

(MH

Z

) ........................................................................................................................... 6-1

 

6.2.

 

SAT

 

SKEW ..................................................................................................................................................................................................... 6-1

 

7.

 

SETUP – AZIMUTH TRIM ...................................................................................................................................................................... 7-1

 

8.

 

SETUP – BLOCKAGE & RF RADIATION HAZARD ZONES ................................................................................................. 8-1

 

8.1.

 

R

ADIATION 

H

AZARD AND 

B

LOCKAGE 

M

APPING

 ...................................................................................................................................... 8-1

 

8.2.

 

P

ROGRAMMING 

I

NSTRUCTIONS

: ................................................................................................................................................................. 8-2

 

9.

 

CONFIGURING THE SATELLITE MODEM INTERFACE. ..................................................................................................... 9-1

 

9.1.

 

S

ATELLITE 

M

ODEM 

I

NTERFACE

 ................................................................................................................................................................... 9-1

 

9.1.1.

 

Reflector setting ........................................................................................................................................................................ 9-2

 

9.1.2.

 

Modem Type setting ............................................................................................................................................................... 9-2

 

9.1.3.

 

Modem I/O setting ................................................................................................................................................................... 9-2

 

9.1.4.

 

Modem I/O – Custom Settings .......................................................................................................................................... 9-3

 

9.2.

 

Q

UICK 

R

EFERENCE

:

  

C

OMMON 

M

ODEM 

L

OCK 

&

 

M

UTE 

S

ETTINGS

 ...................................................................................................... 9-5

 

10.

 

SETUP – TARGETING ............................................................................................................................................................................. 10-1

 

10.1.

 

AUTO

 

TRIM .............................................................................................................................................................................................. 10-1

 

10.2.

 

M

ANUALLY 

O

PTIMIZING 

T

ARGETING

 ..................................................................................................................................................... 10-2

 

11.

 

SETUP – SATELLITE CONFIGURATION .................................................................................................................................... 11-1

 

11.1.

 

S

EARCHING 

P

ATTERNS

 ............................................................................................................................................................................... 11-1

 

11.1.1.

 

Default “Spiral” (Box) Search Pattern .......................................................................................................................... 11-1

 

11.1.2.

 

Inclined Orbit Search Pattern ......................................................................................................................................... 11-1

 

11.1.3.

 

Sky Search Pattern ................................................................................................................................................................ 11-2

 

11.2.

 

TX

 

P

OL SELECT

 ............................................................................................................................................................................................. 11-2

 

11.3.

 

B

AND SELECT

 ................................................................................................................................................................................................ 11-2

 

11.4.

 

X-P

OL 

/

 

C

O

-P

OL SELECT

 ............................................................................................................................................................................. 11-2

 

11.5.

 

S

ELECTING

/C

ONFIGURING 

Y

OUR 

S

ATELLITE 

C

ONFIGURATION

 ......................................................................................................... 11-2

 

12.

 

QUICK START OPERATION ............................................................................................................................................................... 12-1

 

12.1.

 

I

F SATELLITE SIGNAL IS FOUND 

AND

 NETWORK LOCK IS ACHIEVED

: ................................................................................................ 12-1

 

12.2.

 

I

F NO SIGNAL IS FOUND

: ............................................................................................................................................................................ 12-1

 

12.3.

 

I

F SATELLITE SIGNAL IS FOUND BUT NETWORK LOCK IS 

NOT

 ACHIEVED

: ........................................................................................ 12-3

 

12.4.

 

T

T

ARGET A DIFFERENT SATELLITE

 ........................................................................................................................................................ 12-4

 

13.

 

OPTIMIZING CROSS-POL ISOLATION ...................................................................................................................................... 13-1

 

13.1.

 

O

PTIMIZING 

C

ROSS

-P

OL 

I

SOLATION

 ...................................................................................................................................................... 13-1

 

14.

 

INSTALLATION TROUBLESHOOTING ........................................................................................................................................ 14-1

 

EAR Controlled  -  ECCN  EAR99

Содержание SEA TEL 9711IMA-70

Страница 1: ...88 Web http www cobham com satcom Email satcom ohc cobham com February 11 2016 Document No 99 150146 A Sea Tel 9711IMA 70 Installation Manual EAR Controlled ECCN EAR99 EAR Controlled ECCN EAR99 This t...

Страница 2: ...March 1999 on Radio equipment and Telecommunication Terminal Equipment A copy of the R TTE Declaration of Conformity for this equipment is contained in this manual This Sea Tel C Band antenna will me...

Страница 3: ...9711IMA 70 iii Revision History REV ECO Date Description By A N A February 11 2016 Production Release MDN EAR Controlled ECCN EAR99...

Страница 4: ...Earth Stations The products have been assessed to Conformity Procedures Annex IV of the above Directive by application of the following standard s EMC EMC standard for Radio Equipment Maritime ETSI EN...

Страница 5: ...will meet the off axis EIRP spectral density requirements of 25 221 a 1 i with and N value of 1 when the following Input Power spectral density limitations are met 1 5 Meter C Band Models 6006 6009 a...

Страница 6: ...9711IMA 70 vi This Page Intentionally Left Blank EAR Controlled ECCN EAR99...

Страница 7: ...IPMENT LOCATION 2 5 2 8 CABLES 2 5 2 8 1 ADE BDE Coaxial Cables 2 6 2 8 2 Antenna Power Cable 2 6 2 8 3 Air Conditioner Power Cable 2 6 2 8 4 ACU Power Cable Outlet 2 6 2 8 5 Gyro Compass Cable 2 6 2...

Страница 8: ...AGE MAPPING 8 1 8 2 PROGRAMMING INSTRUCTIONS 8 2 9 CONFIGURING THE SATELLITE MODEM INTERFACE 9 1 9 1 SATELLITE MODEM INTERFACE 9 1 9 1 1 Reflector setting 9 2 9 1 2 Modem Type setting 9 2 9 1 3 Modem...

Страница 9: ...edure 15 15 15 4 9 Circular Motor Replacement Procedure 15 16 15 4 10 Circular Limit Switch Replacement Procedure 15 17 15 4 11 Linear Pot Replacement Procedure 15 17 15 4 12 Linear Motor Replacement...

Страница 10: ...9711IMA 70 Table of Contents x This Page Intentionally Left Blank EAR Controlled ECCN EAR99...

Страница 11: ...is input will be distributed to your satellite modem and then to all of your other below decks computer fax and telephone equipment 1 3 Other Inputs to the System Multi conductor cables from Ship s Gy...

Страница 12: ...a A AND MXP B to be able to control Antenna B and ONLY Antenna B You will program the blockage zone s for each of the two antennas refer to Setup Blockage Zones The blockage output from the each of th...

Страница 13: ...s to enable each of the antennas to track the appropriate satellite beam In single network mode when one antenna is blocked its blockage output will command the arbitrator panel to switch services fro...

Страница 14: ...Introduction 9711IMA 70 1 4 This Page Intentionally Left Blank EAR Controlled ECCN EAR99...

Страница 15: ...han 2 5 meters 8 feet away from any GPS receiver antennae Another consideration for any satellite antenna mounting is multi path signals reflection of the satellite signal off of nearby surfaces arriv...

Страница 16: ...stand 1 The height of the pedestal should be kept as short as possible taking into account recommendations given in other Sea Tel Guidelines 2 The minimum height of the pedestal above a flat deck or p...

Страница 17: ...ntial acceleration g force exerted on the antenna will be see chart below When the g force exerted on the antenna is light antenna stabilization and overall performance will not be affected If the g f...

Страница 18: ...ing above the radar and alternate with the ADE below the radar Raked masts pose special problems in both evaluating the mast for stiffness and mounting of antennae As can be seen in the drawing all an...

Страница 19: ...e access hatch for the ADE shall be oriented aft or inboard when practical In any case the orientation of the ADE access hatch shall comply with the SMS guidelines onboard the ship Nets and other safe...

Страница 20: ...shall pass through separate radome penetrations from the signal cable The power cable shall be continuous from the UPS or closest circuit breaker to the ADE connections within the radome The power cir...

Страница 21: ...re already assembled WARNING Hoisting with other than a webbed four part sling may result in catastrophic crushing of the radome Refer to the specifications and drawings for the fully assembled weight...

Страница 22: ...unpack the items from each crate All bolts mounting the equipment in the crate can be removed from the top side There is no longer any need to reach under the pallet to hold nuts while the bolts are...

Страница 23: ...gid Waveguide s located in the Pedestal Crate 3 3 3 Pedestal Crate We recommend that you place the Pedestal Crate in the area that you have chosen to assembly it 1 This is the Pedestal crate 2 Remove...

Страница 24: ...ms in the location where the Pedestal will be assembled NOTE Some systems may have lager groups of assembled counterweight on the pallet 3 3 4 Radome Crate We recommend that you place the Radome Crate...

Страница 25: ...will each be in separate boxes Unpacking the Base Fame and Reflector 1 Open the crate to expose the contents as described above 2 Remove the lower lag bolts from the L brackets left and right that hol...

Страница 26: ...r in the installation instructions 10 Cut the tie wraps that hold the Feed Struts Top Left and Right to the wooden diagonal 11 Keep the struts in this area as the feed will be installed on the reflect...

Страница 27: ...17 Remove the feed assembly from its box If more than one feed is provided with your system only un package the feed which will be first used after the ADE is completely assembled 18 Mount the scalar...

Страница 28: ...er DAC BDE box RF units Wave Guide boxes Hardware Kits and the Air Conditioning unit if one is with the shipment If there are two RF units the Wave Guide and hardware for each is in separate boxes Unp...

Страница 29: ...oss level beam on the pedestal Assure that no cables on the front or back side of the cross level beam are pinched by the lifting straps 9 Attach the lifting hook from a crane or other suitable liftin...

Страница 30: ...lifting apparatus to lift the pedestal off of the crate and relocate it to the area where the pedestal will be sub assembled 3 6 Unpacking the Radome Crate It is recommended that you do not unpack the...

Страница 31: ...lector Feed The area should be a clean flat location free of rocks debris ie concrete The site should also provide protection from wind rain and other adverse weather A hoist or small crane is needed...

Страница 32: ...er open its crate 2 Install it onto the center of the base pan properly oriented with the cutouts in the fiberglass base pan 3 Apply Loctite to and Install the mounting bolts provided with the air con...

Страница 33: ...od alignment of the top provides a good seal between the lower and upper panels 3 To provide a clean caulked seam all around the panels apply painters masking tape to the outside perimeter of each of...

Страница 34: ...o force a bolt into these holes 6 Continue adjoining additional panels loosely installing hardware in the mated vertical flanges and in the horizontal flange to the base pan 7 Continue until all of th...

Страница 35: ...t least TWO people sub assembling the radome one working from the inside and the other outside Sub assemble the sections of the radome on a clean flat location that is free of rocks and debris ie conc...

Страница 36: ...ome Please note this picture shown good alignment as observed from inside the radome and below a flange with bad alignment Good flange alignment Bad flange alignment 6 Open each seam wide enough to in...

Страница 37: ...y or other lifting arrangement to four opposite vertical flange mounting points every other vertical flange 18 Hold the bracket under the bottom flange and install a bolt and fender washer down throug...

Страница 38: ...ed with the pedestal in step 12 below 2 Identify the right side of the equipment frame where the counter weight assembly will be mounted 3 Note the orientation labels 4 Remove the nut and flat washer...

Страница 39: ...Connect M C cable Using a small flat blade screwdriver tighten the retaining screws 11 Locate the BUC Ground Strap on the left side of the equipment frame 12 Cut the red cable ties 13 Extend the grou...

Страница 40: ...F 17 Install the pedestal mounting hardware Apply Loctite and tighten these bolts to torque spec 18 Stow the pedestal at zenith using the stow brace kit provided with the antenna system refer to the s...

Страница 41: ...ackets on the top strut around the edge of the dish to the bracket on the center top of the equipment frame and then to the left into the bracket on the left side of the top of the equipment frame 27...

Страница 42: ...sely install all of the bolts fender washers and nuts to attach the upper panels to the using the hardware provided Do NOT tighten the bolts at this time 3 Start injecting caulking midway between two...

Страница 43: ...mended lifting harness please contact the vendor listed below for price and availability Reference Manufacturer Sea Tel Part Number 119792 A 144 Inch Radome Lifting Harness Lift It Manufacturing Compa...

Страница 44: ...rrent of this device Do NOT combine this with the AC Power provided for the Antenna Pedestal and RF Equipment 1 Install strain reliefs in the desired locations of the base pan where the cable will ent...

Страница 45: ...s Unauthorized installation or service can be dangerous and may invalidate the warranty 3 10 2 Connecting the BDE AC Power Cables Connect the AC Power cables that supply power to the Below Decks Equip...

Страница 46: ...3 13 J12 Aux 232 Auxiliary wired RS 232 connection Wiring is Pin 1 GND Ground Pin 2 Aux IN1 Modem Lock Input 1 See modem setup chapter Pin 3 Aux IN2 Modem Lock Input 2 See modem setup chapter Pin 4 GN...

Страница 47: ...tions The 12 VDC output is only intended to power a very low current consumption device do NOT exceed 125ma MAX Wiring is Pin 1 N C Pin 2 RD Pin 3 TD Pin 4 N C Pin 5 GND Pin6 N C Pin 7 RTS Pin 8 CTS P...

Страница 48: ...ites Set up configure all satellites that the system might use as the ship travels Check Set Home Flag Offset Set up Blockage zone s as needed Acquire the desired satellite Optimize targeting Auto or...

Страница 49: ...thing you need to do is to configure your computer so that it will display the MXP screens Follow these instructions to accomplish that 1 Connect a LAN cable to the back of your computer 2 Connect th...

Страница 50: ...r for the MXP 9711IMA 70 4 2 4 From your computer desktop click the Control Panel button 5 Click on View network status and tasks 6 Click Change adapter settings 7 Click on Local Area Connection EAR C...

Страница 51: ...tocol Version 4 IPv4 10 Click on Use the following IP address 11 In the IP Address boxes enter 10 1 1 102 This is for the IP address of your computer NOTE You could use 101 102 103 etc as long as it i...

Страница 52: ...ne enter Subnet Mask of 255 255 255 0 13 Then click the OK button 14 Back at the Local Area Connection Properties screen click the OK button 15 Click the Close button 16 Close the Control Panel 17 Ope...

Страница 53: ...18 At the log in screen enter the user name password User name and password are case sensitive Dealer password seatel3 SysAdmin password seatel2 User password seatel1 19 After you log in you will see...

Страница 54: ...Configuring a Computer for the MXP 9711IMA 70 4 6 This Page Intentionally Left Blank EAR Controlled ECCN EAR99...

Страница 55: ...unications Interface screen 2 Click the Gyro Type drop down menu 3 Select the correct Gyro type 4 Click Save at the bottom left area of the screen 5 2 If there is NO Ships Gyro Compass Without heading...

Страница 56: ...drives azimuth CCW 360 degrees and continues to alternately steps elevation up down and drives azimuth alternately CW CCW 360 degrees Because of this large search area acquiring the satellite will ta...

Страница 57: ...F value and subtract the LNB s Local Oscillator LO Value the resultant value will equal the Intermediate Frequency IF It is this IF value that will be entered into the MXP for tracking purposes The MH...

Страница 58: ...Setup Tracking Receiver VSAT 9711IMA 70 6 2 This Page Intentionally Left Blank EAR Controlled ECCN EAR99...

Страница 59: ...DE into place When first powering the system up he will enter 90 in the AZ TRIM parameter to indicate that the ADE was rotated CW 90 degrees during the installation This will make initial satellite ac...

Страница 60: ...Setup Azimuth Trim 9711IMA 70 7 2 This Page Intentionally Left Blank EAR Controlled ECCN EAR99...

Страница 61: ...d until the antenna exits the zone The lower and upper azimuth limits are entered into the REL start REL stop and EL fields within the MXP for each of the blockage zones you wish to create up to four...

Страница 62: ...op at 205 degrees Relative Enter REL Start value of 155 0 and REL Stop value of 205 0 In this case the aft deckhouse height only causes blockage up to an elevation of 30 degrees so we set EL to 30 0 I...

Страница 63: ...Radiation Hazard Zones 8 3 5 Likewise for Elevation you need only to enter the elevation angle below which you want the transmitter inhibited blocked 6 Repeat steps 2 5 to describe up to 4 blockage zo...

Страница 64: ...Setup Blockage RF Radiation Hazard Zones 9711IMA 70 8 4 This Page Intentionally Left Blank EAR Controlled ECCN EAR99...

Страница 65: ...y a prompted selection when using the new Commissioning Wizard However the MXP allows configuration of a Custom modem type The primary focus of this procedure is to define all of the parameter options...

Страница 66: ...dem I O setting Use This selection defines which type and location of communication interface between the MXP and the satellite modem Selection Type Drop down menu selection Options OpenAMIP ROAM TS1...

Страница 67: ...network lock signal from the satellite If the lock signal is not received within 30 40 seconds that system will return to the search track line and resume searching for the satellite which provides AG...

Страница 68: ...The Modem I O Block Output selection defines whether or not the MXP will provide a logic level Low or logic level Hi output when a condition exists that requires muting the IF transmission of the syst...

Страница 69: ...a high voltage based input to mute the modem You would set Polarity to Hi and 12V Pull Up to ON If your modem required a low continuity based input to mute the modem You would set Polarity to Low and...

Страница 70: ...Configuring The Satellite Modem Interface 9711IMA 70 9 6 This Page Intentionally Left Blank EAR Controlled ECCN EAR99...

Страница 71: ...loops to completely stabilize It is equally important that you verify that the system is tracking the CORRECT satellite verify a RX lock indication on the satellite modem NOTE The AUTO TRIM feature i...

Страница 72: ...at the satellite should be at After azimuth and polarization also finish driving the elevation will drive to the actual elevation of the satellite 5 As soon as the elevation drives up or down 8 degree...

Страница 73: ...AMPLE The antenna initially targets to an Elevation position of 38 0 degrees and an Azimuth position of 180 2 Shortly after that the Elevation drives to 30 0 degrees and Azimuth stays at 180 2 Calcula...

Страница 74: ...Setup Targeting 9711IMA 70 10 4 This Page Intentionally Left Blank EAR Controlled ECCN EAR99...

Страница 75: ...is position or anywhere within the search pattern the MXP will terminate search and go into Tracking mode If the desired signal is not found the MXP will wait SEARCH DELAY seconds and then begin the s...

Страница 76: ...network lock is achieved in the satellite modem at this position or anywhere within the search pattern the MXP will terminate search and go into Tracking mode If the desired signal is not found the M...

Страница 77: ...for this satellite 4 Select desired TX Polarity from the drop down menu 5 Select desired Band from its drop down menu 6 Assure that reflector is set to Primary 7 Select Cross Pol LNB XPol or Co Pol L...

Страница 78: ...Setup Satellite Configuration 9711IMA 70 11 4 This Page Intentionally Left Blank EAR Controlled ECCN EAR99...

Страница 79: ...aph will be displayed in the header of the MXP GUI pages Upon completion of the above the system will continue to operate automatically indefinitely until AC power to the system is interrupted OR The...

Страница 80: ...cess the Communication Interfaces screen and enter the ships Latitude Longitude position in the fields provided 9 Click Save 10 If the Heading value is correct enter the correct value in the lower rig...

Страница 81: ...ak the antenna position for highest receive signal level from the satellite which has been acquired The system will wait for the modem to achieve lock If the modem does not get lock the antenna will r...

Страница 82: ...ve 11 Check for blockage this is the MOST common cause of not being able to acquire the desired satellite 12 Verify that the correct satellite is selected 13 Check for polarization drive failure 14 Ch...

Страница 83: ...12 5 2 When you make that selection you will see the temporary message Acquiring Satellite Signal Please Wait 3 Shortly after that you will see the temporary message Satellite Signal Found Modem Lock...

Страница 84: ...Quick Start Operation 9711IMA 70 12 6 This Page Intentionally Left Blank EAR Controlled ECCN EAR99...

Страница 85: ...is not skewed this field will be 0 0 3 While talking to the technician at the NOC make adjustments to the Skew value to adjust polarity of the feed under his her direction minus values are accepted t...

Страница 86: ...ng Cross Pol Isolation 9711IMA 70 13 2 8 Double check with the NOC to assure that cross pol is still optimized 9 Conduct any other testing as directed by the NOC ie P1dB compression EAR Controlled ECC...

Страница 87: ...work on the system 14 1 Troubleshooting Ships Gyro Compass problems Ships Heading display does not follow ships movement and or you are getting frequent or constant ERROR CODE 0001 Determine the type...

Страница 88: ...action will offset the display by 120 degrees Check if the display now reads correctly If not move all three leads one more time in the same direction as last time Verify that the ship s heading is co...

Страница 89: ...eration no one should be allowed anywhere within the radiated beam being emitted from the reflector The ultimate responsibility for safety rests with the facility operator and the individuals who work...

Страница 90: ...dentify which part number feed is being installed on your antenna to be able to set the feed drive direction properly Refer to the procedure below to identify which part number feed you have and what...

Страница 91: ...LINEAR RHCP 15 3 1 2 Setting Polarization Drive Log into the IMA GUI and select the Reflector Configuration page 15 3 1 2 1 Feed PN 134869 1 Drive of the older 134869 1 Linear Circular Feed Assembly...

Страница 92: ...a drop in feed skip to step 12 4 If switching drop in feeds remover the currently installed drop in by following step 5 10 5 Disconnect the coax connections to the LNB s 6 Disconnect the flexible wave...

Страница 93: ...e DAC 2202 TX Polarity is set to 2 Horizontal TX 14 Assure that the feed assembly is at its calibration alignment Linear Mode position pin aligned with the Linear notch AND 15 Verify that the feed is...

Страница 94: ...system connect the harness to the Feed DB25 port on the PCU If your antenna is a 9711QOR system connect the harness to the Reflector A DB25 port on the QOR Switch Box 15 4 Field Repair Calibration of...

Страница 95: ...ntiometer Linear Alignment Hole top of Sprocket Linear Limit Switches in background Drop In feed mounts into Scalar Plate 15 4 2 Tools Required PC with ProgTerm installed USB cable Type A to mini USB...

Страница 96: ...GXXXXUYYYYVZZZZ garbage character Pot measurements for the circular feed are the four digit ZZZZ value Pot measurements for the linear feed are the four digit YYYY value 15 4 4 Circular Feed Drive Tes...

Страница 97: ...feed moves toward the CW marker If it does not drive test the diode on the Motor Termination PCB to ascertain if it has failed or is installed backwards 5 Enter g0210 and verify the feed moves toward...

Страница 98: ...rside of the circular section 5 Using your 2mm Allen wrench unscrew the alignment pin and remove the standoff used to stow the pin in place on the feed Save the standoff to re stow the alignment pin a...

Страница 99: ...HCP notch and the alignment pin Carefully screw the alignment pin fully into the RHCP notch RHCP Notch LIN Notch LHCP Notch 16 In ProgTerm type u The result should be formatted as shown to the right P...

Страница 100: ...vely driven by auto pol to the correct linear position for the satellite you have targeted when LINEAR TX polarization MODE is selected The feed assembly does NOT need to be re calibrated as long as t...

Страница 101: ...re aligned and insert your 2mm Allen wrench into the alignment holes to prevent the feed from rotating 8 In ProgTerm type u The result should be formatted as shown to the right Pot measurements for th...

Страница 102: ...he alignment hole in the driven sprocket with the CW hole in the collar underneath the driven sprocket 17 Ensure both holes are aligned and insert your 2mm Allen wrench into the alignment holes to pre...

Страница 103: ...sen the 2 mounting screws disengage and remove the potentiometer assembly by sliding the bracket on its slots and lifting it up off of the screw heads 2 Unplug the potentiometer wire IDC connector fro...

Страница 104: ...een sprocket shaft and remove the sprocket from the motor shaft Save the sprocket for re installation 3 From the underside of the bracket remove the screws that mount the failed motor to its bracket 4...

Страница 105: ...es and heat shrink are already provided on the replacement switch disconnect the wires of the failed switch and punch the wires of the replacement switch into the IDC connector that plugs into the Mot...

Страница 106: ...ibrate the circular section of the feed assembly 15 4 12 Linear Motor Replacement Procedure The feed assembly does not need to be recalibrated as long as the potentiometer has not been replaced diseng...

Страница 107: ...68 page 2 wiring diagram 15 Refer to Linear Feed Calibration Procedure to calibrate the circular section of the feed assembly 15 4 13 Linear Limit Switch Replacement Procedure The feed assembly does n...

Страница 108: ...disappears the antenna is in balance mode DO NOT EXIT THIS SCREEN At the Antenna 4 At the Antenna Balance the antenna with the elevation near horizon referred to as front to back balance by adding or...

Страница 109: ...an Drive turned off See example below The Cross Level displayed above the reference line indicates that CL is driving CCW Left Example The antenna pictured in the screen capture below is imbalanced so...

Страница 110: ...Maintenance 9711IMA 70 15 22 The Azimuth display plots below the red line when the antenna is driven CW and plots above the red line as the antenna is driving CCW EAR Controlled ECCN EAR99...

Страница 111: ...r antenna pedestal mechanism during underway conditions when power is removed from the antenna assembly The normal operating condition for the Sea Tel Antenna system is to remain powered up at all tim...

Страница 112: ...are tightened observe the vertical isolation canister assembly as shown in Figure 4 6 Tighten straps until the canister has been pulled down approx to inch Do not over tighten You must leave approxim...

Страница 113: ...s DC Servo W Brake Cross Level Motor Size 34 Brushless DC Servo W Brake Inertial Reference 3 Solid State Rate Sensors Gravity Reference 2 MEMS Tilt Sensors AZ transducer 256 line optical encoder home...

Страница 114: ...i at 6 18 GHz RX Gain 38 5 dBi at 3 95 GHz G T 30 elevation clear sky 19 0 dB k calculated FCC Input Power Spectral Density Limitation 7 0 dBW 4 KHz C band Feed Type Prime Focus Circular linear select...

Страница 115: ...r 124556 1 Gain typical 58 dBm Noise temperature maximum 15K to 35K Power requirements 15 to 24 V supplied through center conductor of IF cable Current typical 350 mA typical LO Phase Noise typical 73...

Страница 116: ...m LNB 2 Co Pol J3 SMA F RXIF Output To Rotary Joint J4 B A Ethernet RJ45 Serial M C A Radio M C B Pass through J5 Mini USB Antenna M C J6 DE 9 F Serial Console Antenna Serial M C J7 DE 9 F Serial Radi...

Страница 117: ...rk Interface 4 port managed fast Ethernet switch User Interface Web Browser Console Port Motor Driver Enclosure Connectors Drive DA 15P Home DE 9S AZ DA 15S EL DA 15S CL DA 15S Status LEDs CL Drive Ye...

Страница 118: ...pment Media Xchange Point MXP Standard 19 Inch Rack mount One Unit High Physical Dimensions 17 X 17 X 1 75 Inches 43 18 x 43 18 x 4 45 cm Input Voltage 85 264 VAC 47 63Hz single phase 110 Watts Weight...

Страница 119: ...nput 2 Pin 4 GND Ground Pin 5 SW1 Modem Mute Output 1 Pin 6 SW2 Modem Mute Output 2 Pin 7 SW3A Dry Contact set 1 Pin 8 SW3B Dry Contact set 1 Pin 9 SW4A Dry Contact set 2 Pin 10 SW4B Dry Contact set 2...

Страница 120: ...63Hz single phase 110 Watts 17 3 Regulatory Compliance Survival Shock and Vibration IEC 60945 MIL STD 167 Operational Shock and Vibration Operational IEC 60945 Survival MIL STD 167 EMI EMC Compliance...

Страница 121: ...ished Due to the voltage losses across the multi conductor cables Sea Tel recommends the following wire gauge for the AC DC multi conductor cables used in our standard pedestal installations Run Lengt...

Страница 122: ...9711IMA 70 Technical Specifications 9711IMA 70 17 10 This Page Intentionally Left Blank EAR Controlled ECCN EAR99...

Страница 123: ...ing Assy ICU 18 15 135994 1 Mounting Assy RF 18 17 134867 1 Antenna Assembly 2 4M Offset 9711 IMA 70 18 19 62 147931 Tx Rx Feed Sub Assembly C Band Linear Circular Selectable DishScan 18 23 69 150063...

Страница 124: ...Drawings 9711IMA 70 18 2 This Page Intentionally Left Blank EAR Controlled ECCN EAR99...

Страница 125: ...AC EX CE 7 1 ea 124556 1 A 07 MCO 00020128 LNB C BAND PLL NORSAT 3120N 10 1 pcs 62 147931 A 02 ECO 00015664 Feed Assy C Band Circ Lin TX RX 11 1 ea 129337 1 A ECO 00008544 INSTALL KIT AIR CON BREAKER...

Страница 126: ...3 4 5 6 7 8 8 7 6 5 4 3 2 1 INTERPRET TOLERANCING PER ASME Y14 5 2009 PROJECTION FINISH MATERIAL DRAWN BY APPROVED BY TITLE FIRST USED SIZE SCALE SHEET NUMBER DRAWING NUMBER VER K D H 1 21 16 1 22 97...

Страница 127: ...3120N 5 1 pcs 124571 3 B 03 MCO 00020128 SSPB C BAND CODAN MBUC 40W 6740 W E AC EX CE 5 1 pcs 124571 4 B 03 MCO 00020128 SSPB C BAND CODAN MBUC 60W 6760 W S AC EX CE 5 1 pcs 124571 6 B 03 MCO 00020319...

Страница 128: ...HARNESS ASSY 400MHZ MODEM TO CPI SSPB 120 IN 40 1 ea 115708 3 L ECO 00008542 CIRCUIT BREAKER BOX ASSY 97 220V 41 1 ea 88 207375 000 A ECO 00013207 POWER RING ASSY 3CH 20 AMP 42 1 ea 139646 84 B ECO 00...

Страница 129: ...GHz DUAL COAX 62 2 ea 115492 10 MCO 00012114 ADAPTER SMA F SMA F BULKHEAD 70 1 pcs 88 147964 A MCO 00019241 Waveguide Filter BP with Radar Reject 80 1 ea 112991 6 MCO 00012113 WAVEGUIDE WR 137 FLEXGU...

Страница 130: ...115 6 C ECO 00008542 CABLE ASSY F M F M 6 FT 120 2 ea 110567 19 MCO 00012115 ADAPTER N F N F STRAIGHT FLANGE MNT 130 1 ea 119479 10 C ECO 00008542 CABLE ASSY CAT5 JUMPER 10 FT 131 1 ea 119478 5 E ECO...

Страница 131: ...02 11 2016 08 58 41 AM PST Find Num Qty Inventory Unit LN6 Number Rev Description Title BOM Notes DL 150065 A Introductory SYSTEM BLOCK LIST 9711 70 IMA RBUC MBUC Created By Mike Needham Create Time...

Страница 132: ...EAR Controlled ECCN EAR99...

Страница 133: ...EAR Controlled ECCN EAR99...

Страница 134: ...EAR Controlled ECCN EAR99...

Страница 135: ...5752 ELECT EQU FRAME ASSY 9711 70 IMA MBUC 4 1 ea 134867 1 J ECO 00010733 ANTENNA ASSY 2 4M OFFSET 9711 5 1 pcs 69 150063 A 01 ECO 00015752 WAVEGUIDE RUN 9711 70 IMA MBUC RBUC 8 1 ea 135997 1 A ECO 00...

Страница 136: ...MAY APPEAR IN A DIFFERENT ORIENTATION THAN THE DRAWING DEPICTS FOR SOME VARIANTS REFER TO THE BILL WORK ORDER 5 12 2 1 8 3 4 14 SURFACE ROUGHNESS Sea Tel Inc dba Cobham SATCOM Concord DIMENSIONS AND A...

Страница 137: ...LE TIE HOLDER 281 DIA PUSH MOUNT 60 1 ea 114593 164 MCO 00012113 SCREW SOCKET HD 10 32 x 1 2 SS 66 1 ea 119952 011 MCO 00012114 WASHER STAR INTERNAL TOOTH 10 SS 68 1 ea 114580 011 MCO 00012113 WASHER...

Страница 138: ...ACH TO ASS Y 7 IDENTIFY ASS Y PER SEATEL SPEC 122930 APPROX WHERE SHOWN MOUNTED WITH 1 OVERHANG FROM WELDMENT HT RELEASE TO PRODUCTION CORRECT ITEM 5 LOCATION WAS REV A 02 06 14 11672 A K D H ITEM 4 W...

Страница 139: ...12113 STUD FULLY THREADED 1 4 20 x 1 1 2 SS 56 6 ea 114581 029 MCO 00012113 WASHER LOCK 1 4 SS 57 6 ea 114580 027 MCO 00012113 WASHER FLAT 1 4 SMALL PATTERN SS 58 2 ea 119952 029 MCO 00012114 WASHER S...

Страница 140: ...NTERPRET TOLERANCING PER ASME Y14 5 2009 K D H RELEASED TO PRODUCTION WAS X2 4 10 12 9572 A HT ITEMS 56 57 WERE QTY 8 ADD ITEM 58 ADD NOTE 6 RELOCATE HARDWARE TO NEW MOUNTING HOLES 07 05 12 9836 B SUR...

Страница 141: ...MACHINING DISHSCAN 6 1 ea 128430 1 B ECO 00008544 HARDWARE KIT INSTALL OFFSET ANTENNA 29 6 ea 114583 029 MCO 00012113 NUT HEX 1 4 20 SS 50 8 ea 114593 162 MCO 00012113 SCREW SOCKET HD 10 32 x 3 8 SS...

Страница 142: ...C ON SHEET 3 HARDWARE USED TO MOUNT REFLECTOR TO PEDESTAL INDICATED HARDWARE USED TO MOUNT LNB SEE SYSTEM BOM FOR LNB PART NUMBER NOTE ORIENTATION OF BOTTOM MOTOR WHEN MOUNTING MOTOR TO ALIGN WITH STR...

Страница 143: ...68 67 61 10X 8 FEEDS SHOWN FOR REFERENCE ONLY D C B A A B C D 1 2 3 4 5 6 7 8 8 7 6 5 4 3 2 1 SIZE SCALE SHEET NUMBER DRAWING NUMBER REV B 1 4 97 134867 A 2 OF 3 1 SHOWN C BAND LIN CIR SELECTABLE B B...

Страница 144: ...D C B A A B C D 1 2 3 4 5 6 7 8 8 7 6 5 4 3 2 1 SIZE SCALE SHEET NUMBER DRAWING NUMBER REV B 1 4 97 134867 A 3 OF 3 10 NOTE ORIENTATION EAR Controlled ECCN EAR99...

Страница 145: ...NEAR FEED 8 1 ea 108519 1 H ECO 00008542 WEIGHT TRIM 4 0 OZ 15 2 ea 117218 2 MCO 00012113 GASKET WR 137 CPRG FULL 16 1 ea 134165 14A MCO 00012114 GASKET WR 229 CPR 229 FULL 17 1 ea 134165 15A MCO 0001...

Страница 146: ...ER LNB SHOWN FOR REFERENCE ONLY REFER TO SYSTEM BOM FOR LNB PART NUMBER 3 4 PROTECT WAVEGUIDE END WITH CAP 5 BLUE SHRINK WRAPPED IDC CONNECTS TO LINEAR DRIVE PCB 6 RED SHRINK WRAPPED IDC CONNECTS TO L...

Страница 147: ...5 7 6 7 D C B A A B C D 1 2 3 4 5 6 7 8 8 7 6 5 4 3 2 1 SIZE SCALE SHEET NUMBER DRAWING NUMBER VER B 1 2 97 147931 A 2 OF 2 DOCUMENT N0 99 149137 A EAR Controlled ECCN EAR99...

Страница 148: ...RDWARE KIT WR 137 CPR FLANGE 21 3 ea 117218 2 MCO 00012113 GASKET WR 137 CPRG FULL 22 1 ea 118294 11 A ECO 00008542 HARDWARE KIT WR 137 DBL FLANGE 30 1 ea 140981 1 A ECO 00008547 CLAMP BAND FLEXGUIDE...

Страница 149: ...CO 00012113 NUT HEX 1 4 20 SS 70 1 ea 114586 625 MCO 00012113 SCREW HEX HD 3 8 16 x 1 1 4 SS 76 2 ea 114580 038 MCO 00012114 WASHER FLAT 3 8 SS 7 8 OD X 13 32 ID 075 THK 77 2 ea 114580 034 MCO 0001211...

Страница 150: ...TO SUPPORT FLEXGUIDE POSITION ITEMS SO THAT THEY APPLY MINIMUM FORCE AGAINST FLEXGUIDE AND ALLOW FLEXGUIDE TO HANG FREELY 3 76 80 69 76 80 DETAIL A SCALE 1 4 60 67 68 2X 34 3 9 22 21 21 DETAIL B 1 20...

Страница 151: ...3 X 10 4 25 LBS 50 2 ea 114586 551 MCO 00012113 SCREW HEX HD 1 4 20 x 4 SS 51 2 ea 114586 552 MCO 00012113 SCREW HEX HD 1 4 20 x 4 1 2 SS 52 2 ea 114586 553 MCO 00012113 SCREW HEX HD 1 4 20 x 5 SS 58...

Страница 152: ...R SEATEL STANDARD 122298 2 COUNTERWEIGHTS SHOWN ARE STARTING POINT PROPER BALANCE SURFACE ROUGHNESS WEIGHT P EVERS D C B A A B C D 1 2 3 4 5 6 7 8 8 7 6 5 4 3 N A 2 1 PROJECTION FINISH MATERIAL DRAWN...

Страница 153: ...0 1 EA 126602 2 F CRATE ASSY DOME 144 0 1 EA 140637 13 A HARDWARE KIT MULTI PANEL RADOME 144IN 0 12 EA 117762 1 B SILICONE ADHESIVE WHT RTV 122 10 1 NOT SHOWN PL C1 B2 DC Radome_ACC_Box Radome_Crate...

Страница 154: ...URE PER SEA TEL STANDARD 122298 9 LK STRAIN RELIEF WAS 109258 8 11 7 05 5050 N CK ADDED DASH 27 10 17 07 N A N1 K D H ADD SHIPPING CRATE 01 02 13 9799 Q K D H SHIPPING CRATE WAS 126602 09 17 13 10778...

Страница 155: ...M6 X 40 MM SCREWS 60X DETAIL A 60X M6 FENDER WASHER M6 NUTS 204X M6 FENDER WASHER M6 X 25 MM SCREWS 102X M6 FENDER WASHER M6 X 25 MM SCREWS SCALE 1 8 DETAIL B RADOME PANEL UPPER M6 NUTS USE OF HARDWA...

Страница 156: ...NTERNAL A C 3 1 EA 123728 1 C RADOME PAN ACCESS ASSY WHITE 4 1 EA 122508 G A C INSTALL ASSY INTERNAL 75 BASE 61 4 EA 114586 540 SCREW HEX HD 1 4 20 x 1 1 4 SS 62 8 EA 114580 029 WASHER FLAT 1 4 SS 63...

Страница 157: ...DRAWN BY APPROVED BY TITLE FIRST USED SIZE SCALE SHEET NUMBER DRAWING NUMBER REV B SCC 12 14 04 1 1 E1 1 OF 2 DRAWN DATE APPROVED DATE REVISION HISTORY REV ECO DATE 123723 XX97 RADOME BASE ASSY 75 IN...

Страница 158: ...A B C D 1 2 3 4 5 6 7 8 8 7 6 5 4 3 2 1 SIZE SCALE SHEET NUMBER DRAWING NUMBER REV 1 8 123723 B 2 OF 2 2 INTERNAL AC SPIDER MOUNTING BASE 3 83 1 80 82 82 81 8X 4 63 62 62 61 2 4 4X 6 EAR Controlled E...

Страница 159: ...EAR Controlled ECCN EAR99...

Страница 160: ...EAR Controlled ECCN EAR99...

Страница 161: ...ENT DOCUMENT S REQUIRED SEE COMMENTS LASTEST DOCUMENT 136505 INCLUDED 50 4 EA 114586 535 SCREW HEX HD 1 4 20 x 1 2 SS 51 4 EA 114586 537 SCREW HEX HD 1 4 20 x 3 4 SS 52 2 EA 121323 544 SCREW FLAT HD S...

Страница 162: ...ORDERED ITEM 60 TO 50 61 TO 51 62 TO 55 AND 63 TO 56 ADDED ITEM 5 52 57 58 CHANGED NOTE 1 REMOVED NOTE 2 CHANGED NOTE 3 TO 2 ADDED NEW NOTE 3 12 13 11 TBD F SL ADD DASH 2 ITEM 3 QTY WAS 2 ADD ITEM 20...

Страница 163: ...55 DETAIL C 56 SCALE 1 3 2X 3 G D C B A A B C D 1 2 3 4 5 6 7 8 8 7 6 5 4 3 2 1 SIZE SCALE SHEET NUMBER DRAWING NUMBER REV B 1 16 122508 2 OF 2 55 57 58 52 DETAIL D SCALE 1 8 2X EAR Controlled ECCN E...

Страница 164: ...MBER DRAWING NUMBER REV B RJW 1 8 2007 NONE 123496 1 OF 1 DRAWN DATE APPROVED DATE INTERNAL CLOSED CELL FOAM OUTLET 1 2 NPT DRAIN A A 1 50 80 1 25 15 25 30 00 MAX 2X 80 IN OUT AIR FLOW CONTROL PANEL 1...

Страница 165: ...EAR Controlled ECCN EAR99...

Страница 166: ...r to work with supply voltages between 200 and 250 volts alternating current at either 50 or 60 Hertz frequency This solution involves introducing a buck voltage reducing transformer between the circu...

Страница 167: ...6 1 6 Qty 2 13 UNC x 1 25 inch hex head stainless steel cap screws 6 1 7 Qty 2 13 UNC hex head stainless steel nuts 6 1 8 Qty 4 inch stainless steel flat washers 6 1 9 Qty 2 inch stainless steel sprin...

Страница 168: ...irm all power to the antenna is secured and tagged out per the ship s Safety Management System SMS Secure the A C circuit breaker in the OFF position 7 3 Disconnect the power cable for the Dometic Air...

Страница 169: ...Page 5 of 7 Document No 134069 Rev B Photograph 1 Mounting of Transformer under Spider Figure 1 Simplified Electrical Diagram Buck Transformer Dometic Air Conditioner A C Breaker Sea Tel Antenna 1 2...

Страница 170: ...354 Revision M or earlier 7 8 3 1 Ensure all fasteners are tight between the transformer and its bracket 7 8 3 2 Carefully lift the buck transformer and place over the spider 7 8 3 3 Slide the transfo...

Страница 171: ...etaining nut of the plug tightly onto the receptacle thread 7 12 Close up all opened panels replacing with identical fasteners as required 8 0 Records 8 1 All training records to be held by HR 8 2 Sea...

Страница 172: ...tripping hazard inside the radome Only one cable may be installed in each strain relief Center to center spacing of the holes for the strain reliefs must not be less than 1 80 Typical Transmit Receiv...

Страница 173: ...ass resin to set per resin manufacturer s instructions Note Like all chemical reactions set time will be temperature humidity dependent 5 5 Refer to strain relief assembly drawing 124903 attached Bein...

Страница 174: ...R 1 1 EA 109258 8 G2 STRAIN RELIEF 2 1 EA 124904 A LOCKNUT 3 1 EA 124905 A SEALING RING 4 1 EA 124354 1 A1 RUBBER STOPPER 5 1 EA 114580 033 WASHER FLAT 1 2 S S 1 SHT 1 OF STRAIN RELIEF ASS Y PROD FAMI...

Страница 175: ...ZIPLOC BAG AND LABEL STRAIN RELIEF 3 2 1 3rd ANGLE DIMENSIONS ARE IN INCHES N A D C B A A B C D 1 2 3 4 5 6 7 8 8 APPROVED DATE DATE DESCRIPTION BY ASSEMBLY INTERPRET TOLERANCING PER ASME Y14 5M 1994...

Страница 176: ...EFERENCE DESIGNATOR 1 1 EA 138633 4 B1 BDE CABLE KIT 4012GX MXP 2 1 EA 136872 A1 BRACKET ASSY CONNECTOR RACK MOUNT 3 1 EA 139410 B BOX ACCESSORY 1 SHT 1 OF BELOW DECK KIT MXP PROD FAMILY COMMON EFF DA...

Страница 177: ...EAR Controlled ECCN EAR99...

Страница 178: ...EAR Controlled ECCN EAR99...

Отзывы: