Table of Contents
9711IMA-70
vii
1.
INTRODUCTION .......................................................................................................................................................................................... 1-1
1.1.
G
ENERAL
S
YSTEM
D
ESCRIPTION
................................................................................................................................................................. 1-1
1.2.
P
URPOSE
.......................................................................................................................................................................................................... 1-1
1.3.
O
THER
I
NPUTS TO THE
S
YSTEM
.................................................................................................................................................................. 1-1
1.4.
S
YSTEM
C
OMPONENTS
................................................................................................................................................................................. 1-1
1.5.
D
UAL
A
NTENNA
C
ONFIGURATION
............................................................................................................................................................. 1-2
1.6.
D
UAL
N
ETWORK
A
RBITRATOR
.................................................................................................................................................................... 1-2
1.7.
A
UTOMATIC
B
EAM
S
WITCHING
(ABS) .................................................................................................................................................... 1-3
1.8.
O
PEN
AMIP™,
ROAM
OR
VACP ............................................................................................................................................................... 1-3
1.9.
FCC
C
OMPLIANCE
......................................................................................................................................................................................... 1-3
2.
SITE SURVEY .................................................................................................................................................................................................. 2-1
2.1.
S
ITE
S
ELECTION
A
BOARD
T
HE
S
HIP
.......................................................................................................................................................... 2-1
2.2.
A
NTENNA
S
HADOWING
(B
LOCKAGE
)
AND
RF
I
NTERFERENCE
.............................................................................................................. 2-1
2.3.
M
OUNTING
F
OUNDATION
........................................................................................................................................................................... 2-2
2.3.1.
Mounting on Deck or Deckhouse ...................................................................................................................................... 2-2
2.3.2.
ADE Mounting Considerations ........................................................................................................................................... 2-2
2.3.3.
Sizing of the support pedestal ............................................................................................................................................ 2-2
2.4.
M
OUNTING
H
EIGHT AND
F
ORE
-A
FT
L
OCATION
..................................................................................................................................... 2-2
2.5.
M
AST
C
ONFIGURATIONS
............................................................................................................................................................................. 2-3
2.5.1.
Vertical Masts .............................................................................................................................................................................. 2-4
2.5.2.
Raked Masts .................................................................................................................................................................................. 2-4
2.5.3.
Girder Masts ................................................................................................................................................................................. 2-4
2.5.4.
Truss Mast ..................................................................................................................................................................................... 2-5
2.6.
S
AFE
A
CCESS TO THE
ADE .......................................................................................................................................................................... 2-5
2.7.
B
ELOW
D
ECKS
E
QUIPMENT
L
OCATION
..................................................................................................................................................... 2-5
2.8.
C
ABLES
............................................................................................................................................................................................................. 2-5
2.8.1.
ADE/BDE Coaxial Cables ........................................................................................................................................................ 2-6
2.8.2.
Antenna Power Cable .............................................................................................................................................................. 2-6
2.8.3.
Air Conditioner Power Cable ............................................................................................................................................... 2-6
2.8.4.
ACU Power Cable/Outlet ........................................................................................................................................................ 2-6
2.8.5.
Gyro Compass Cable ................................................................................................................................................................ 2-6
2.9.
G
ROUNDING
.................................................................................................................................................................................................... 2-6
3.
INSTALLATION ............................................................................................................................................................................................. 3-1
3.1.
G
ENERAL
C
AUTIONS
&
W
ARNINGS
........................................................................................................................................................... 3-1
3.2.
P
REPARATION
................................................................................................................................................................................................. 3-1
3.3.
O
PENING YOUR CRATES
................................................................................................................................................................................ 3-2
3.3.1.
Location of Items inside the Crates ................................................................................................................................. 3-2
3.3.2.
Base Frame and Reflector Crate ........................................................................................................................................ 3-2
3.3.3.
Pedestal Crate ............................................................................................................................................................................. 3-3
3.3.4.
Radome Crate: ............................................................................................................................................................................. 3-4
3.4.
U
NPACKING THE
B
ASE
F
RAME AND
R
EFLECTOR
C
RATE
......................................................................................................................... 3-5
3.5.
U
NPACKING THE
P
EDESTAL
C
RATE
............................................................................................................................................................ 3-8
3.6.
U
NPACKING THE
R
ADOME
C
RATE
: ........................................................................................................................................................... 3-10
3.7.
A
SSEMBLING THE
ADE ............................................................................................................................................................................... 3-11
3.7.1.
Preparing for Assembly of the ADE .............................................................................................................................. 3-11
3.7.2.
Sub-assemble the Base Frame Assembly ................................................................................................................... 3-11
3.7.3.
Marine Air Conditioner ........................................................................................................................................................ 3-12
3.7.4.
Assembling the Lower Radome Panels ........................................................................................................................ 3-12
3.7.5.
Sub-assemble the upper panels of the 144” Radome Assembly ................................................................... 3-15
3.7.6.
Sub-assemble the Antenna Pedestal ............................................................................................................................ 3-18
3.7.7.
Close the 144” Radome Assembly ................................................................................................................................. 3-22
3.8.
P
REPARING TO
H
OIST THE
ADE ................................................................................................................................................................ 3-23
EAR Controlled - ECCN EAR99
Содержание SEA TEL 9711IMA-70
Страница 6: ...9711IMA 70 vi This Page Intentionally Left Blank EAR Controlled ECCN EAR99...
Страница 10: ...9711IMA 70 Table of Contents x This Page Intentionally Left Blank EAR Controlled ECCN EAR99...
Страница 14: ...Introduction 9711IMA 70 1 4 This Page Intentionally Left Blank EAR Controlled ECCN EAR99...
Страница 54: ...Configuring a Computer for the MXP 9711IMA 70 4 6 This Page Intentionally Left Blank EAR Controlled ECCN EAR99...
Страница 58: ...Setup Tracking Receiver VSAT 9711IMA 70 6 2 This Page Intentionally Left Blank EAR Controlled ECCN EAR99...
Страница 60: ...Setup Azimuth Trim 9711IMA 70 7 2 This Page Intentionally Left Blank EAR Controlled ECCN EAR99...
Страница 74: ...Setup Targeting 9711IMA 70 10 4 This Page Intentionally Left Blank EAR Controlled ECCN EAR99...
Страница 78: ...Setup Satellite Configuration 9711IMA 70 11 4 This Page Intentionally Left Blank EAR Controlled ECCN EAR99...
Страница 84: ...Quick Start Operation 9711IMA 70 12 6 This Page Intentionally Left Blank EAR Controlled ECCN EAR99...
Страница 122: ...9711IMA 70 Technical Specifications 9711IMA 70 17 10 This Page Intentionally Left Blank EAR Controlled ECCN EAR99...
Страница 124: ...Drawings 9711IMA 70 18 2 This Page Intentionally Left Blank EAR Controlled ECCN EAR99...
Страница 132: ...EAR Controlled ECCN EAR99...
Страница 133: ...EAR Controlled ECCN EAR99...
Страница 134: ...EAR Controlled ECCN EAR99...
Страница 159: ...EAR Controlled ECCN EAR99...
Страница 160: ...EAR Controlled ECCN EAR99...
Страница 165: ...EAR Controlled ECCN EAR99...
Страница 177: ...EAR Controlled ECCN EAR99...
Страница 178: ...EAR Controlled ECCN EAR99...