T H E S M A R T S O L U T I O N F O R E N E R G Y E F F I C I E N C Y
Vertical Stack
R e v. : 0 4 / 2 4 / 2 0 1 9
55
c l i m a t e m a s t e r. c o m
Start-Up Log Sheet
Start-Up Log Sheet
Installer:
Complete unit and system checkout and follow unit start-up procedures in the IOM. Use this form to record
unit information, temperatures and pressures during start-up. Keep this form for future reference.
Job Name:
________________________________
Street Address:
___________________________________
Chassis Model Number:
_____________________
Serial Number:
____________________________________
Cabinet Model Number:
_____________________
Serial Number:
____________________________________
Unit Location in Building:
______________________________________________________________________
Date:
______________________________________
Sales Order No:
___________________________________
In order to minimize troubleshooting and costly system failures, complete the following checks and data entries before
the system is put into full operation.
PCS Motor: (Circle) HI TAP, MED TAP, LOW TAP
ECM Motor CFM Setting:
Cooling - (Circle) Default, Min, Max, or ______
Temperatures: (Circle) F or C
Heating - (Circle) Default, Min, Max, or ______
Pressures: (Circle) PSIG or kPa
Antifreeze: __________Type: __________%
Cooling Mode
Heating Mode
Temperatures
Return-Air DB
Supply-Air DB
Air Temperature Differential
Entering Fluid
Leaving Fluid
Fluid Temperature Differential
Units with DXM2 *
LT1
LT2
Discharge Line
Leaving Air
Voltages
Supply at Unit
Transformer Low Side
Amps
Compressor
Allow unit to run 15 minutes in each mode before taking data.
Do not connect refrigerant gauges during start up unless instructed by ClimateMaster service tech.
*Temperatures can be read with service tool or communicating thermostat.