T H E S M A R T S O L U T I O N F O R E N E R G Y E F F I C I E N C Y
Vertical Stack
R e v. : 0 4 / 2 4 / 2 0 1 9
21
c l i m a t e m a s t e r. c o m
Slab
Opening for
“G” Panel
15' Whip
Note 2
(Notes 1 and 3)
(1461)
57½”
24
½
”
(622)
5
7⁄8
”
(622)
24.25”
(616)
One or two layers
of drywall. Set
studs accordingly.
Finished Wall
Cabinet
Supply Air
Ductwork
(Customer Supplied)
Canvas Type
Flex Boot
(Customer
Supplied)
(1650)
65”
NOTICE - Drywall openings shown below are for specifi c
cabinets as indicated. Cut openings for your cabinet
and thermostat.
Drywall Openings
for D5G0RAE115E010C and G Return Air Panel
Cabinet
Figure 10
Notes:
1. Optional factory-installed whips (Model Digit 13) end with 9 pin molex connector.
2. Field-supplied 2x4 Box must be a type that the side can be removed so molex can be put inside. Position box
horizontal or vertical for thermostat.
3. Optional 15, 25, or 35 foot whips (thermostat cable Class 2) available. Whips in BX armor available as special.
4. 1” to 12”(25 to 305) stands available, stands are bulk shipped and must be fi eld installed.
5. When stands are used, make sure riser length and position is calculated correctly. Stand pads raises everything up.
6. For 2” fi lter, set cabinet 2” (50) minimum from front of drywall.