C L I M A T E M A S T E R W A T E R - S O U R C E H E A T P U M P S
TSL Vertical Stack
R e v. : 0 4 / 2 4 / 2 0 1 9
18
C l i m a t e M a s t e r Wa t e r - S o u rc e H e a t P u m p s
Typical Cabinet with L Return Flush Mounted Air Panel Installation
NOTICE!
Frame is attached to studs. Panel is
removable for chassis access.
1. Dimensions are in inches .
2. Frame and panel painted bright white.
3. Panel is removavable for fi lter replacement or chassis removal.
4. Frame ships with cabinet—must be installed while framing.
5. Set bottom track 1/8" in front of cabinet.
6. Drywall mud is added to the corner bead to produce a smooth fi nished surface.
7. Unobstructed area for required air fl ow.
Removable
Inner Panel
Fixed
Frame
D
58.50
.75
F
G
.
50
E
Return Air Panel
Cabinet
Cabinet
Cabinet
Top View
Front View
Shim (if needed)
Screw
4” TYP
8”
From bottom of cabinet
6”
A
C
(RO)
(RO = Rough Opening)
B
Steel
Stud
3
1/2
web
Continuous
Bottom
Track
Foam
Frame
Note 7
Note 5
Corner Bead
Caulk Gap
1/8
Drywall
Frame Installation
Unit
AVHRL
Digit 6
D
E
F
G
09,12
1
22.1
2.0
19.5
55.8
15,18
2
24.1
2.0
21.5
55.8
24
3
29.6
2.0
26.5
55.9
30,36
4
29.6
2.0
26.5
55.9
Unit
A
B
C
09,12
22.3
58.6
2.5
15,18
24.3
58.6
2.5
24,30,36
29.7
58.6
2.7
30 and 36 will have
stamped louvers.