T H E S M A R T S O L U T I O N F O R E N E R G Y E F F I C I E N C Y
Vertical Stack
R e v. : 0 4 / 2 4 / 2 0 1 9
17
c l i m a t e m a s t e r. c o m
Master/Slave Cabinet Installation
2” (50) Minimum
extend copper stubs
for S/R/C if over 3” (75)
Master
Slave
(Note 4)
RA
R
R
R
S
S
S
RA
Field install P-Trap and clamp
both ends. Suggest hard drain
connection be extended into
cabinet so clamp is always
accessable.
Field connect
hoses in both cabinets-
supply to supply and return to return.
(Cabinet supply is closest to corner,
chassis supply is on left facing air coil)
Field braze valve package
slave side (shut off with tubing).
(Note 5) Shuttoff handle to be
inside cabinet.
Slave Cabinet
Riser Pads (4)
Note 4
Notes:
1. Contractor must meet all fi re code requirements.
2. Size riser diameter for both units GPM.
3. Master/Slave means both units share common riser.
4. Install pads on back of slave cabinet to cover slots used for S/R risers.