Purlin Connection Note:
Purlin connected to end rafters using
QH1070
pipe strap.
*One purlin run connected to end rafter using
QH1070
pipe strap.
Purlin connected to mid rafters using
102546
2.375" cross
connectors.
*Purlin connected to mid rafters using
102548
1.66" cross
connectors.
Cable Connection Note:
Clamps used for cable connections are not installed on every rafter
.
Sidewall cable connections installed on end and 2nd from end rafters only.
Corner cable connections installed on end rafter
s
only.
2375S124D
2375S124D
28SM23S1
28SM23S1
20SM23P2
166S099
166P040
166S099
166S099
104302
104302
QH1304
strut
QH1308
strut
QH1308
strut
QH1304
strut
Purlin Connection
Purlin Connection
Purlin Connection
Purlin Connection
Purlin
Connection
Purlin
Connection
Purlin
Connection
*Purlin Connection
Side cabl
e
connection
Corner cable
connection
Side cable connection
Side cable connection
Side cable connection
Corner cable connection
Ground Level
Chord Purlin
CHORD PURLIN INST
ALLA
TION NOTE:
Install the chord
purlin 8'
from the center position
to prevent conflicts with
the 14' x 1
1' roll-up door
.
Do not install the chord purlin in