![ClearSpan PB00010R4N Скачать руководство пользователя страница 14](http://html.mh-extra.com/html/clearspan/pb00010r4n/pb00010r4n_manual_2621853014.webp)
CLEARSPAN
™
STORAGE MASTER
14
Revision date: 05.08.19
DOOR FRAME DIAGRAM: SPECIAL NOTE
ATTENTION:
For some overhead doors, the upper brackets need to be mounted wider than the
actual door frame. In those instances, cut a 16" section of stock 2" x 2" door frame tubing and mount
it to the outside of each vertical door frame using the supplied carriage bolts and nuts in the locations
shown in the diagram below. (Frame shown may differ from actual frame.)
END WALL SPECIAL NOTE:
If no door is to be
installed in the end wall, attach square tubing
using the QH1330 brackets in the areas identified
by the dashed lines below.
Install square tube at the bottom of the door
opening and in the center of the opening
when no door is installed.
These can be removed to install a door later
if desired.
This tube is
cut from the
remainder
of end wall
framing.
2" x 2" Header Tube
Photo to the right shows an installed roll-up door
as seen from inside the shelter. Door mounting
brackets are attached to the door frame
extensions shown above.
Door Frame Extension cut from
2" x 2" square end frame tubing
and bolted to the 2" x 2" door
frame.