CLEARSPAN
™
POLY BUILDINGS
16
Revision date: 05.20.20
9. Using the diagrams on this page and those at the end of this
instruction guide, assemble the next interior rafter.
ATTENTION:
The first two rafters at each end and two (2)
near the middle of the frame include the additional purlin
pipes inserted into pre-drilled holes in the rafter pipes.
These
locations are also the cable positions.
10. Repeat Step 8 to secure the rafter pipes in the couplers and
purlins to the couplers.
IMPORTANT:
Install a FA4482B Tek
screw through each purlin pipe and into the coupler pipe.
11. Repeat the rafter assembly procedure (Steps 9-10) and work
toward the middle of the building frame.
12. At the 65' position on the frame, assemble the interior rafter–
Rafter #14–and continue with the procedure on the next page
to assemble Rafters #15 and #16. See the diagram on the next
page for additional details.
6
A
B
36HB287P2M
36HB287P1M
36HB287P1M
36HB287P2M
36HB287P1M
125P058
RAFTER AND MAIN FRAME ASSEMBLY (continued)
A
B
CP287X125M
CP287X125M
125P058
125P058
125P058
FA4482B