TABLE OF CONTENTS
SAFETY CONSIDERATIONS AND GUIDELINES.............................................................. 4
TIPS FOR MAINTAINING HIGH PERFORMANCE............................................................ 6
FURNACE ASSEMBLY....................................................................................................... 7
(1) Installing the blower........................................................................................... 7
(2) Air discharge configuration................................................................................ 10
- Unit Heater (Free Air with no ductwork)...................................................... 10
- Central Furnace (ductwork installed).......................................................... 12
(3) Installing the combustion chamber target.......................................................... 13
(4) Installing the burner........................................................................................... 13
(5) Installing the connector block and oil line.......................................................... 14
FURNACE INSTALLATION........................................................................... ..................... 15
(1) Selecting a location........................................................................................... 16
(2) Mounting the furnace in position........................................................................ 17
(3) Connecting the electrical supply........................................................................ 18
(4) Installing the chimney components................................................................... 19
(5) Oil storage tank set up ...................................................................................... 21
(6) Installing the metering pump and oil lines......................................................... 21
(7) Connecting the compressed air line.................................................................. 26
(8) Installing the wall thermostat............................................................................. 27
PREPARING THE METERING PUMP FOR START UP..................................................... 27
STARTING AND ADJUSTING THE BURNER.................................................................... 28
(1) Preparing the burner for start up....................................................................... 28
(2) Priming the oil pump.......................................................................................... 28
(3) Adjusting the Burner.......................................................................................... 28
RESETTING THE OIL PRIMARY CONTROL..................................................................... 29
SETTING THE DRAFT........................................................................................................ 30
MAINTENANCE.................................................................................................................. 31
SEQUENCE OF OPERATION............................................................................................35
TROUBLESHOOTING GUIDE........................................................................................... 36
FURNACE DIMENSIONS................................................................................................... 38
WIRE DIAGRAMS.............................................................................................................. 41
BURNER POWER SWITCH............................................................................................... 47
PARTS DIAGRAMS............................................................................................................ 48
CHIMNEY INSTALLATION DIAGRAMS............................................................................. 74
SERVICE RECORDS......................................................................................................... 76
WARRANTY INFORMATION............................................................................................. 77
Содержание CE-140
Страница 50: ...50 NOZZLE ADAPTER HEATER BLOCK ASSEMBLY 2 3 19 5 7 8 15 9 17 14 18 16 13 1 4 6 10 11 12 ...
Страница 52: ...52 MANIFOLD BLOCK ASSEMBLY 8 6 2 1 4 17 3 9 5 7 12 13 14 15 16 18 19 11 10 ...
Страница 58: ...58 3 4 6 1 2 5 CE 140 180 BLOWER ...
Страница 62: ...62 2 3 4 5 6 1 CE 250 BLOWER ...
Страница 66: ...66 CE 330 BLOWER 12 8 7 4 13 1 2 3 5 6 9 10 11 ...
Страница 70: ...70 CE 440 BLOWER 12 8 7 4 13 1 2 3 5 6 9 10 11 ...
Страница 72: ...72 METERING PUMP ASSEMBLY WITH A2RA 7720 PUMP HEAD 3 1 2 4 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 22 23 5 21 ...