36
Clean Energy Hea ng Systems
Troubleshoo ng Sequence
BURNER DOES NOT
ATTEMPT TO START
GREEN LIGHT
IS ON
GREEN LIGHT
IS OFF
MAKE SURE CIRCUIT
BREAKER / POWER
SWITCH IS ON
MAKE SURE BURNER
CONNECTOR CORD
IS PLUGGED IN PROPERLY
BYPASS THE WALL
THERMOSTAT BY
JUMPING THE T-T
TERMINALS ON THE
PRIMARY CONTROL
PRIMARY
CONTROL
RED LIGHT IS
FLASHING
(Soft Lockout)
PRIMARY
CONTROL
RED LIGHT IS ON
CONTINUOUSLY
(Hard Lockout)
BUTTON HOLD
(PRESS 15+ SEC.)
BUTTON CLICK
(PRESS <1 SEC.)
RED LIGHT IS
NOT ON AT
PRIMARY
CONTROL
CHECK TEMPERATURE OF
THE NOZZLE ADAPTER
HEATER BLOCK
HOT
COLD
ALLOW HEATER
BLOCK TO WARM UP
FOR APPROX. 10 MIN.
HOT
COLD
REPLACE HEATER
ELEMENT
CHECK VOLTAGE ACROSS ALL SWITCHES IN THE LIMIT CIRCUIT:
- PROVING SWITCH
(MOUNTED ON NOZZLE ADAPTER HEATER BLOCK)
- AUTO HIGH LIMIT SWITCH
(MOUNTED ON TOP OF FURNACE CABINET)
- HIGH LIMIT SWITCH
(MOUNTED ON TOP OF FURNACE CABINET)
REPLACE SWITCH THAT IS
NOT ALLOWING 120 VOLTS TO
BE DELIVERED TO RED WIRE
ON THE PRIMARY CONTROL
CHECK FOR
VOLTAGE ON THE
RED WIRE (LIMIT
CIRCUIT) GOING TO
THE PRIMARY
CONTROL
120 VOLTS
NO VOLTAGE
REPLACE
PRIMARY
CONTROL
REPLACE THE WALL
THERMOSTAT
BURNER DOES
NOT FIRE
BURNER FIRES
CE70151
Содержание CE-140
Страница 50: ...50 NOZZLE ADAPTER HEATER BLOCK ASSEMBLY 2 3 19 5 7 8 15 9 17 14 18 16 13 1 4 6 10 11 12 ...
Страница 52: ...52 MANIFOLD BLOCK ASSEMBLY 8 6 2 1 4 17 3 9 5 7 12 13 14 15 16 18 19 11 10 ...
Страница 58: ...58 3 4 6 1 2 5 CE 140 180 BLOWER ...
Страница 62: ...62 2 3 4 5 6 1 CE 250 BLOWER ...
Страница 66: ...66 CE 330 BLOWER 12 8 7 4 13 1 2 3 5 6 9 10 11 ...
Страница 70: ...70 CE 440 BLOWER 12 8 7 4 13 1 2 3 5 6 9 10 11 ...
Страница 72: ...72 METERING PUMP ASSEMBLY WITH A2RA 7720 PUMP HEAD 3 1 2 4 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 22 23 5 21 ...