![Clean Energy CE-140 Скачать руководство пользователя страница 10](http://html.mh-extra.com/html/clean-energy/ce-140/ce-140_owners-manual_2620003010.webp)
10
FURNACE ASSEMBLY
Air Discharge Configurations:
Your Clean Energy Heating System may be installed in one of two ways:
1.
Unit Heater
- Louvers are installed over the air outlet opening(s) to direct the hot air
flow in the desired direction.
2. Central
Furnace
(Static
Pressure)
- Duct work applications with less than 0.30”
W.C.
(inches of water column).
Louvers are NOT installed. Ductwork is installed over the side
air outlet opening(s) to direct the hot air flow.
NOTICE:
A qualified electrician should check the amp draw of the blower motor. Do not
operate the blower motor over 85% of the amp rating on the motor nameplate.
1.
Unit Heater Configuration
There are several options for mounting the louvers on a unit heater for free air applications.
Refer to Figures 3, 4, and 5. Cover the unused air outlet openings with the blank covers
provided (one is painted and one is galvanized). The blank covers can be split in two.
NOTICE:
When splitting a side opening horizontally, the louvers should be positioned in the
top half of the air outlet opening. When splitting a side opening vertically, the louvers should
be positioned in the front (closest to the burner) half of the air outlet opening.
Figure 3: Installing the Louvers
One Side Air Outlet Fully Open
CE70159
Содержание CE-140
Страница 50: ...50 NOZZLE ADAPTER HEATER BLOCK ASSEMBLY 2 3 19 5 7 8 15 9 17 14 18 16 13 1 4 6 10 11 12 ...
Страница 52: ...52 MANIFOLD BLOCK ASSEMBLY 8 6 2 1 4 17 3 9 5 7 12 13 14 15 16 18 19 11 10 ...
Страница 58: ...58 3 4 6 1 2 5 CE 140 180 BLOWER ...
Страница 62: ...62 2 3 4 5 6 1 CE 250 BLOWER ...
Страница 66: ...66 CE 330 BLOWER 12 8 7 4 13 1 2 3 5 6 9 10 11 ...
Страница 70: ...70 CE 440 BLOWER 12 8 7 4 13 1 2 3 5 6 9 10 11 ...
Страница 72: ...72 METERING PUMP ASSEMBLY WITH A2RA 7720 PUMP HEAD 3 1 2 4 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 22 23 5 21 ...