
3.6. Connecting Power
This section describes connecting power. As soon as power is applied, the W20B will boot-up and
cOS Core will start.
Important
Please review the electrical safety information in
The image below shows the back of the W20B. This is divided into four sections secured by
screws.
Figure 3.2. Rear view of the Clavister W20B
Connecting AC Power
To connect power, follow these steps:
1.
Connect the end of the power cord to the power inlet on the W20B.
Figure 3.3. W20B Power Switch and Power Inlet Socket
2.
Plug the other end of the power cord into a grounded power outlet.
3.
Power is controlled by a rocker switch situated to the left of the power inlet socket. To
switch on, depress the upper part of the switch so it moves to the On position.
4.
The W20B will boot up as soon as power is applied and cOS Core will start. The progress of
the boot up can be seen on a CLI console connected to the local console port.
5.
After a brief period of time, cOS Core will be fully initialized and the W20B is then ready for
configuration using a direct console connection or via the default management Ethernet
interface.
Initial cOS Core configuration is described in
Chapter 4, cOS Core Configuration
Chapter 3: W20B Installation
29
Содержание NetWall W20A
Страница 12: ... i Orange when cOS Core is running normally Chapter 1 W20B Product Overview 12 ...
Страница 14: ...Chapter 1 W20B Product Overview 14 ...
Страница 31: ...Chapter 3 W20B Installation 31 ...
Страница 70: ...Chapter 4 cOS Core Configuration 70 ...
Страница 80: ...Appendix B Declarations of Conformity 80 ...
Страница 81: ...Appendix B Declarations of Conformity 81 ...